The bricklayer comes into play, and the main work content is bricklaying and leveling. Bricklaying includes kitchen and bathroom balcony wall tiles and large and small floor tiles. If there is no floor tile, the ground is flat. This project is a face-saving project, which is different from the previous hydropower transformation and waterproofing. These works are paved by a pair of skillful hands of bricklayer Fu. The following is the inspection summary of bricklayer's works.
A, bricklayer approach four steps
1, butt joint, the gap between tiles is uniform and the width is consistent. The newly laid ceramic tile, the gap is glued and fixed with clips, gaskets and the like, and evenly rubbed with caulking agent after drying. It looks symmetrical and beautiful.
2. Look at the inside corner. The inner corner is the right angle formed by the intersection of two brick depressions at the same position as the corner. Here is generally a brick by brick, check whether the internal angle is a 90 right angle. If it is not a right angle, when installing furniture such as cabinets and bathroom cabinets in the later stage, the corners of the furniture can't fit perfectly with the wall, leaving gaps.
3, the ground leveling. What I'm talking about here is kitchen and bathroom balcony floor tiles. My family hasn't reached the same level, but I have seen and heard a lot. The leveling here is not to find the level, but to find the slope, so that the floor drain is horizontal and the ground does not accumulate water.
4, check the empty drum. Let's talk about checking the empty drum time first. Don't post it in front of the master, check it behind you, so you can type it out when it's empty. Check the empty barrels. Generally, after 2 or 3 days of paving, the cement will set, and knocking will not knock the brick down. Tap the center and four corners of the tile with hard objects such as keys and small hammers to listen to the sound. The sound is indescribable, but the word "drum" will inspire you. Knock more bricks and hear different voices, and you will know what an empty drum is.
Second, the bricklayer comes into play to prepare materials
This is very simple, whether it is cleaning or big bag, tiles are necessary, and the joint sealant is generally provided by the owner. Cleaners have to prepare sand cement, so don't worry about big bags and small bags. Ladders are generally not independent.
1, 200W light bulb, incandescent lamp, kitchen and bathroom, 2 or 3, one in each room, only one for the master to change, but it is better to use it in the future. Mainly lighting. Master's skill is good, and it's light enough, right?
2, towels and other rags. This is mainly to clean tiles. Wet bricks should be cleaned, pasted bricks should be cleaned, corners of paved bricks should be cleaned, and caulking agent should be used. The more the better, the better after washing and drying.
3. Several floor drains. This was done when the master laid the floor tiles. It's convenient to buy a special floor drain for washing machine and put it under the water level of washing machine. The floor drain can feed water quickly, and it can also prevent odor. Water-sealed floor drains are not suitable for places where water is not often used, such as balconies. After the water evaporates, the deodorizing function fails.
4, a broom, which was waterproof before, should be ready. I want to buy the kind of sorghum stalk, not plastic, too soft to eat.
Third, the bricklayer's project handover problem
1. Where are the flowers, waistlines and special shapes? A master will tell you whether it is feasible and how to remedy it if it is not feasible.
Do you want to keep this tape? My neighbor left eight cassette holes on a wall in the kitchen. The reason is that after the hydropower transformation, the unused cassette was not marked, so the bricklayer stayed. As a result, there are almost no uncut bricks on one wall, not to mention how to decorate it later, and whether it will affect the installation of the hanging cabinet is a problem. So, one more word, don't think that the master knows everything.
Whether the pipeline is included. This is generally not a problem. Red brick bag, sauna board, cement board, aluminum-plastic board, etc., don't use it in the early stage, but use cabinet bag in the later stage, but calculate the account first.
Have you left the sewer? This is related to the pipeline package. Yes, but it's not pretty. Generally, the straight sewer pipe will not be blocked at half a height, but everything is afraid of an accident. Generally, the master will cut the brick in half and knock it off when it is overhauled later. If it is knocked off, it will not look good, hehe.