According to the hydropower planning of the middle reaches of Xiangquan River, the installed capacity of "one reservoir with five levels" is 46,000 kilowatts, with a drop of 233 meters. Among them, the development project A Qing Hydropower Station has an installed capacity of 20,000 kilowatts, which will become the largest hydropower station in Ali. The dam site is located about 15km upstream of Zhada County. The proposed reservoir has a normal water level of 38 10m, a storage capacity of 242 million cubic meters and an average annual power generation of 82.42 million kwh.
After the completion of the power station, it will become the backbone power supply of Ali Power Grid in Tibet, which will effectively promote the economic development of Ali area and improve people's living standards.