1. Before the flexible membrane ceiling enters the site, ensure the site is unobstructed and free of construction waste.
2. If the light strip is installed in the flexible membrane ceiling, the recessed depth is generally controlled between 120- 150 mm, which is too shallow and uneven, and too deep and not high enough. If the lamp tube is installed, the depth of the recess is at least 200 mm
3. The bottom treatment of flexible membrane ceiling meets the installation conditions. Before construction, it is best to communicate with the site construction personnel about lace materials. Aluminum edge is different from plastic edge.
4. The installation of all lamps and lanterns must be carried out according to the required size, and the wiring should be well arranged, and all lamps and lanterns should be electrified and bright. If any lamps are not lit before installing the soft film, they should be adjusted and replaced in time after notification. The interior of the hidden lamp should be painted white to achieve better effect. At the same time, we should also observe whether the light illumination is uniform. The spacing between tubes or strips should be the same.
5. Air conditioning and fire fighting pipes must be pre-drained, and there is no problem in installation and debugging. Tuyere, nozzle and smoke detector should meet the requirements after installation.
6. It's best to put the optical tape transformer on the edge of the access port for maintenance.
7. After the installation of the flexible membrane ceiling, if the painter needs to repair the gypsum board ceiling, should he touch the flexible membrane ceiling? Flexible ceiling has always been a well-known brand in decorative materials, so what is unique about its installation compared with traditional ceiling?
Please look at the comparison between soft film smallpox and traditional smallpox in detail. From here, you can find many advantages of soft film smallpox, which is incomparable to traditional smallpox!