1, that is, the filing category, can directly carry out decoration construction and fire protection construction after the scheme is approved, and then organize materials to be submitted to relevant departments for fire protection filing, and then draw lots.
2. It's an audit. After the drawing review, the fire protection design review will be started, and the construction and decoration construction will be allowed only after the review is qualified. After the construction, submit the materials to relevant departments for final fire control acceptance.