Delivery date of Lvtangxia resettlement house during construction period

After the main body of any house is completed, it will take at least 5~6 months to hand over the house.

After the main body is completed. It is necessary to carry out plastering decoration inside and outside and install water heating appliances. The roof is waterproof, and roofing works should be done. Door and window installation. Construction, installation and acceptance of electrical fire protection engineering. Installation and construction of outdoor roads, pipelines, lawns and street lamps. Completion acceptance is also required. You can't hand over the house until it is qualified.