How to stipulate the fire protection below 500 square meters?

The fire protection regulations below 500 square meters are as follows:

1, online filing is required, and the specific website is on the websites of provincial fire brigades;

2. Put the design on record first, then draw lots. If there is no draw, it will be accepted directly and put on record. If it is drawn, it is necessary to provide relevant information to the fire department within 5 working days, and the fire department will check it within 20 working days;

3 through the verification, to be accepted and put on record; Unqualified, according to the requirements of rectification after the record again;

4. Acceptance and filing is also a spot check system. If it is not selected, it will be submitted to the pre-opening inspection directly. If it is selected, it is necessary to provide relevant information to the fire department within 5 working days, and the fire department will check it within 20 working days;

5. Check the declaration and write-off before opening, and re-check and record after rectification is unqualified;

6. Construction can be started after filing. However, those who start business without pre-opening inspection will be ordered to stop production and operation and be fined 30,000 to 300,000. If it is not implemented within the time limit, the fire department will enforce it.

legal ground

People's Republic of China (PRC) Fire Protection Law

Article 8 Local people's governments at all levels shall incorporate fire control planning into fire control safety layout, fire control stations, fire control water supply, fire control communication, fire truck access, fire control equipment, etc. Incorporate into urban and rural planning and be responsible for organizing the implementation.

Urban and rural fire safety layout does not meet the requirements of fire safety, it should be adjusted and improved; If public fire-fighting facilities and fire-fighting equipment are insufficient or do not meet the actual needs, they should be added, rebuilt, equipped or technically transformed. Fifteenth public gathering places put into use, fire safety inspection before business implementation of notification commitment management. Before the public gathering place is put into use and put into business, the construction unit or the user unit shall apply to the fire rescue agency of the local people's government at or above the county level where the place is located for fire safety inspection, promise that the place meets the technical standards and management regulations on fire control, submit the required materials, and be responsible for the authenticity of its promises and materials.

Fire rescue agencies to review the materials submitted by the applicant; If the application materials are complete and conform to the statutory form, it shall be permitted. Fire rescue institutions shall, in accordance with the technical standards and regulations on fire control, timely inspect the promised public gathering places.

If the applicant chooses not to adopt the notification commitment method, the fire rescue agency shall, within ten working days from the date of accepting the application, inspect the place in accordance with the technical standards and management norms for fire control. If it meets the fire safety requirements after inspection, it shall be licensed.

Without the permission of the fire rescue agency, public gathering places shall not be put into use or business. The specific measures for fire safety inspection shall be formulated by the emergency management department of the State Council.