The Third Jiekou Bridge in Conghua City is located at11on the main stream of Liuxi River in the northeast of Jiekou Bridge. After the project is completed, it will be connected to 105 National Highway and Jiebei Expressway in the east, 355 Provincial Highway, Beijing-Zhuhai Expressway and 106 National Highway in the west, leading to Guangzhou, Zengcheng, Qingyuan and Qingyuan. In order to reduce the traffic pressure of Jiekou Bridge in Conghua City, promote urban development and improve the investment environment of Conghua City, according to the spirit of the reply of Conghua Municipal Government Office in 20041February 1 1 day. Reply no 124 from gigino. [2004] No.4, the design scheme of Jiekou Third Bridge in Conghua City is now open for public bidding, and the Urban Construction and Municipal Administration Bureau of Conghua City is the main body of this project.

1. Project Overview: This bridge starts from Egongtou River embankment on Hedong North Road in the south and ends at Hexi Zhonglian Dike in the north, with a total length of 807.7 meters. In which: the length of bridge section is 255.6m, the length of approach road is 552. 1m, and the width of bridge is 40m. The planned investment is about 4.771.7 million yuan.

2. Qualification requirements: The bidder must have the qualification of Grade B or above in bridge design and Grade B or above in engineering investigation as stipulated by the state.

Three, the bidding applicant shall submit the following information at the time of registration:

1, bid application letter; The applicant's identity card; Letter of introduction from the unit;

2. Business license of the enterprise; Design qualification certificate, including the type and grade of the certificate and the scope of tasks allowed by the certificate;

3. A certificate from the legal representative of the enterprise and a valid power of attorney signed or sealed by the legal person to participate in the bidding of this project;

4. Provide reliable supporting documents of the design experience of the secondary bridge project completed in the past five years (including survey and design contract, project scale, investment scale, awards, performance reputation, penalties and informed criticism, etc.). );

5. List of persons in charge, main technicians, technical equipment and application software to be invested in this project subject to tender, including relevant technical qualification certificates and personnel performance experience.

6. Copy of registration certificate of Guangzhou survey and design enterprise.