Technical specification for safety of tunneling quality acceptance workers?

First, the post conditions

Article 1. You must receive professional and technical training before taking up your post, and you can only take up your post after passing the examination.

Article 2. Seriously study the relevant contents of safety regulations and operating procedures, master the acceptance criteria of tunnel construction quality and the use, operation and maintenance of related measuring instruments, be familiar with tunnel construction technology, and have certain on-site construction experience.

Second, the safety regulations

Article 3 The quality inspector shall have a high sense of responsibility, strictly follow the principle of process management of "checking the last process, ensuring this process and serving the next process", and carefully supervise and inspect the quality of each process in the construction process.

Article 4 The quality inspector shall carefully record and timely sort out all kinds of test data, timely arrange rectification for unqualified products, and do a good job of re-inspection.

Article 5 The acceptance work shall be carried out together with the person in charge of on-site construction, so as to confirm and arrange rectification.

Article 6 strictly implement the system of on-site succession. During the shift change, it is necessary to explain clearly the safety status, construction quality, construction progress, the use of materials, tools and equipment on site and other important matters.

Third, the preparatory work

Article 7 Safety inspection of working environment.

1. According to the principle of supporting the roof first and then supporting the roof from outside to inside, carefully check the supporting situation within the scope of work, strictly implement the system of knocking on the roof and asking for the roof, and use long-handled tools to find out the living gangue and dangerous rock of the roof and roof.

2. Good ventilation, complete safety facilities and sensitive and reliable equipment.

3. Ladders or scaffolding used for climbing operations must be placed firmly and reliably.

4. Check mechanical and electrical equipment, safety facilities, etc.

Article 8 the tool materials and waist line inspection, preparation.

1. Prepare all kinds of measuring instruments and other tool materials, and inspect the measuring instruments to ensure that the measurement is accurate and can meet the use requirements. General inspectors should carry a steel rule, rope, chalk, acceptance record (this), recording pen and necessary construction drawings. The main project will also carry special test tools, meters and instruments. Special test equipment can be placed and stored on site. Such as: wrenches, anchor tensioners, inclinometers.

2. Check and extend the center line and waist line signs of the construction site. In the construction site where laser pointing is used, the working state of the laser pointing instrument should be checked, and the problems should be handled in time.

Fourth, the acceptance operation

Article 9 General steps.

1. Determine the acceptance baseline: according to the design requirements and site conditions, and the relationship between the roadway centerline and the construction centerline, the arch baseline and the waist line, determine the acceptance baseline and mark it.

2. Draw the outline of the roadway: Draw the outline of the construction roadway according to the roadway section and construction details.

3. Acceptance: according to the acceptance baseline and roadway contour line, according to the operation procedures and engineering quality acceptance standards, the unqualified items are arranged for rectification and recorded.

Method for determining the acceptance baseline in Article 10.

1. heading face pointed by laser: determined according to the relationship between the waist line in the construction roadway and the center position of the laser point.

2. No laser tunneling faces:

(1) Determine the center line of roadway construction by looking at the line manually, and determine the center line of roadway according to the positional relationship between the center line of construction and the center line of roadway, and mark it properly.

(2) Use slope gauge (or other measuring tools) to mark the waistline head-on according to the designed slope, and determine and mark the waistline according to the relationship between the construction waistline and the acceptance benchmark waistline. When the inclinometer extends the waist line, the line should be tightened, and the middle position of the positive and negative mark points should be taken.

Article 1 1 When there is too much waste rock in the working area of the semi-arch roadway, in order to find out the center position of the semi-arch, the flat chord method can be used to determine the contour line of the semi-arch above the waste rock.

(1) The center line of the roadway can be determined according to the relevant requirements of 10, 1 and 2.

(2) Convert the original waistline or arch baseline to be higher than the height of gangue accumulation as the construction waistline, and extend it head-on, so as to determine the vault height of semi-circular arch and mark it.

(3) Determine the center position of the vault by combining (1) and (2).

(4) According to the data relationship between the chord position and chord length in the detailed construction drawing, the endpoint positions of the chord lines are determined from the vault down in turn and marked.

(5) Connect the determined chord endpoints with smooth curves to draw the outline of the arched roadway.

Article 12 Quality acceptance (the quality standards uniformly formulated by the company shall be implemented according to different support forms and types).

1. Whether the specifications, quality, quantity, location and sequence of supporting materials meet the requirements.

2. Tunneling section quality: whether the eye mark rate of smooth blasting, over-under-excavation size, head-on section flatness, circulating footage and maximum top control distance meet the requirements.

3. Quality of temporary support: whether the quantity, specification, location, condition of rings, quality of back-top connection and head-on empty top distance of temporary support meet the requirements.

4. Roadway support quality: clear width, clear height and mid-waist line, whether the forward and backward inclination of shed roadway meet the requirements, the angle facing the mountain, the position and quantity of supporting wood and pad, the top quality of back side, the depth of column nest, shed distance, torque, the level of supporting beam and the interface of shed beam meet the requirements.

5. Quality of bolting and shotcreting: row spacing, angle, position, exposed length, pre-tightening force, tension between anchors (cables); Whether the pallet mesh pressing quality, metal mesh laying lap, concrete thickness, surface smoothness and foundation depth meet the requirements.

6. Whether the angle, depth and position of the blast hole meet the requirements of the blasting chart.

7. Whether the quality of ditches and tracks meets the requirements.

8. Whether feng shui pipes, cable hanging, sanitation and cleaning, and material stacking meet the requirements.

9. Whether other acceptance items meet the requirements.

13 Precautions

1. When measuring the geometric dimensions of the roadway, the centerline and waistline of the roadway must be vertical.

2. When using the slope gauge (or other instruments) to measure the slope or angle, it is necessary to measure the slope gauge twice in both positive and negative directions and take the average value twice. General requirements: the use of inclinometer and horizontal roadway line should be controlled within 10 meter, and the detection position should be averaged twice from the positive and negative sides of the midpoint of the cable; If the stay is more than 5 meters, the inclinometer method is generally not used to determine the waist line. When the cable length of inclined lane is less than10m, when using inclinometer, two positions must be set for measurement, which are respectively placed at 1/3 of the rope length, and the average value is taken, and then the two points are added and divided by 2. Using inclinometer to extend waist line and measure angle is only applicable to general roadway, and theodolite must be used to measure the extension of main roadway.

3. When measuring the river line of shed roadway, the measuring datum point must be located in the center line of roadway.

4. When testing the pull-out resistance of anchor rod (or anchor cable) on site, the lifting device connected with anchor rod (or anchor cable) must be supported by special personnel, and the personnel should hide in a safe place when lifting; After tensioning, release the pressure first, then the personnel approach, dismantle the tensioning device connected with the anchor rod and re-fasten the anchor rod.

5. Quality inspection must be carried out in a well-supported space, and it is forbidden to work under the empty roof.

6. In order to simplify the work, the horizontal special rubber hose can be used in the construction of parallel middle extension waist line, but it must be used correctly.

Verb (abbreviation of verb) data processing

Article 14. Fill in all kinds of measurement data truthfully according to the content requirements of on-site acceptance records, and do not omit or tamper with them.

Article 15. After the quality inspector goes into the well, he must rearrange and fill in the special acceptance records of the team site according to the on-site records, or make statistical processing on all kinds of acceptance records in time, and report the existing quality problems and safety problems in time and make records.

Article 16 All kinds of acceptance records must be properly kept as the basis for rewards and punishments and quality evaluation.