According to the decoration process, first of all, the hydropower installed by the developer is only the approximate location. When the owner carries out fine decoration, the water and electricity shall be installed at the location required by the owner.
After the installation of water and electricity, the bathroom is waterproof for three times, and then the wall tiles are laid, and the bathroom is decorated. Balcony and kitchen are pasted with walls, and wooden doors are installed indoors. It takes time to tile and install wooden doors. After the tiles are pasted, there is a process of shrinkage, solidification and drying. When can the tiles go? At least a week.
The extended data wall needs to be scraped three times with putty powder. Although there are many kinds of putty powder, there is only one suitable for fine decoration of walls, that is, water-resistant putty powder. Water-resistant putty powder is cured well and can be waterproof. It is no problem to scrub the dirty wall with clean water, even in wet summer.
Scrape the water-resistant putty powder for three times, and scrape it for the second time after the first time is completely dry. Don't scrape the putty powder too thick, which is easy to cause quality problems. Just scrape the wall thin. The waterproof putty powder is dried for three times, and the wall surface is polished with fine sandpaper, and then the latex paint can be brushed.