House decoration sequence

First, 1 step is house inspection. Are waterways and circuits qualified? Is there any short circuit or open circuit? Pressure test all water pipes. The closing of the window. If it is the top floor, check the roof for leakage.

Step 2: Determine the horizontal line. All horizons should be on the same horizontal line, and the lower the horizontal line, the better. If there are both floors and tiles, then the final height of the floors and tiles should also be on the same horizontal plane. The specific location of this horizontal line should be determined according to the construction data of different materials and painted on the wall as the standard horizontal line for future construction.

Step 3: Hydropower construction. It should be noted that after the construction is completed, the hydropower construction company should issue accurate hydropower construction drawings for future maintenance. After the wire construction is completed, it should be able to pull. After the completion of water pipe construction, pressure test should be done, and the pressure will not drop for 20 minutes.

Step 4: Wood structure. The foreman arranged the transportation of woodworking tools and materials, and explained the construction contents with carpenters. Carpenter ceiling, if air conditioning and fresh air system are installed, a large number of ceilings are needed to block the pipeline. Woodworking professional modeling, such as porch, TV wall, etc. Woodworking makes cabinets, stairs and handrails, wooden door frames, window covers, door covers, etc. The standard to measure the quality of woodworking works mainly depends on whether the size is accurate and whether it is horizontal and vertical.

Step 5: bricklayer's construction. Bricklayer materials (cement, sand, wall reinforcement, waterproof materials, etc. ) should be present to explain the construction content with the bricklayer. Contact the tile manufacturer to send tiles, contact the stone manufacturer to deliver them, and then the bricklayer's construction. Bricklayers should pay attention to installing cast iron bathtub.

Step 6: Determine the wooden door. Accurately measure the wooden door, pay the full amount, and the manufacturer starts production. General wooden door factory does not send hardware, hinges, door locks, door suction should be purchased by themselves.

Step 7: Make cabinets. Cabinet accurate measurement, full, factory blanking production, can also be used as a bathroom cabinet. It is not only economical to let cabinet manufacturers make bathroom cabinets, but also the door panels of cabinets can meet the requirements of waterproof and fire prevention. At the same time, it can be delivered with the cabinet to avoid excessive charges.

Step 8: Install aluminum gusset ceiling in kitchen and bathroom. The exhaust ports of bathroom yuba and fresh air system should be installed on the same day as the ceiling, and before the ceiling. Contact the range hood manufacturer and install the cut exhaust pipe near the pipeline, because the ceiling can't be installed in the future. Prepare lamps and lanterns, and install them when installing the ceiling.

Step 9: The foreman arranges the oil to enter the site and explains the construction contents. The owner contacts the latex paint manufacturer to prepare for delivery, and decides the color of latex paint according to the color card. The construction of oil workers is mainly divided into three parts: carpentry, wall treatment and painter.

Step 10: Install cabinets and bathroom cabinets, first install cabinets, then install countertops. It is convenient for cabinet workers to install the kitchen sink, and holes need to be opened on the countertop. Cookware also needs to be turned on by table workers on site. Cookware of range hoods is generally installed by manufacturers.

Step 1 1: floor installation. It is suggested that on the day of floor installation, the owner should personally stare at it, otherwise it is easy to have problems.

Step 12: Brush the latex paint again.

Step 13: wooden door installation. Many flooring merchants hope to install wooden doors before installing the floor. If the wooden door is not installed, the floor skirting line next to the wooden door cannot be installed, which is more troublesome. But if the wooden door is installed first, the floor installation will be dirty and messy, which may pollute or damage the wooden door. You can ask the floor manufacturer to leave more skirting lines, which is convenient for the workers of the wooden door manufacturer to install.

Step 14: Start jointing at this time, so that the jointing agent will not be polluted by the harsh decoration environment.

Step 15: First cleaning. In order to prevent the relatively clean construction links from being polluted by the environment in the future, it is necessary to clean them up now.

Step 16: It is necessary to customize the measurement of sliding door wardrobe or walk-in cloakroom.

Step 17: Contact sanitary ware for delivery and installation.

Step 18: Install the range hood.

Step 19: Laying wallpaper.

Step 20: Install curtain rods: You can buy curtains slowly in the future, and install curtain rods first. If we delay any longer, the tools and workers will be withdrawn. You can't install without tools.

Step 2 1: install lamps, including main lamps, spotlights, downlights, ceiling lamps and mirror headlights.

Step 22: Install sliding door wardrobe and walk-in cloakroom.

Step 23: Install air conditioner, air conditioner outlet and fresh air system outlet.

Step 24: Clean the environment for the second time.