House decoration geomantic omen
1. First, please invite the decoration team to build a wall at home and paint the new home first.
2. Do a 24-hour closed water test on the bathroom and kitchen floor (the developer needs to complete this task).
3. Trenching, hydropower transformation and acceptance.
4. Buried trunking concealed hydropower renovation project, and waterproof project will be started when there is no leakage in closed water test.
Stick a disk on the wall of bathroom and kitchen.
6. Carpenters the site, hangs the ceiling and plasters the corner line.
7. Door covers and window covers. Make a wooden cabinet frame.
8. At the same time, make all kinds of wooden doors, modeling doors and flat pressing.
9. Brush the board with dust-proof paint (clear oil).
10. Leveling and laying of marble countertops on windowsills.
1 1. Veneer, thread, hardcover.
12. Treatment, grinding and leveling of wall foundation.
13. Furniture, with adhesive (protective edge) attached at the joint near the door.
14. wall oil ICI at least three times.
15. Furniture shall be painted and nail holes shall be repaired and painted.
16. Handle the corner, lay floor tiles, solid wood or composite wood floors, waterproof marble strips and skirting lines.
17. Installation and debugging of lamps, sanitary wares, handles and door locks.
18. Cleaning, floor tile repair and withdrawal.
19. Internal preliminary acceptance of decoration company.
20. Three parties make an appointment for formal acceptance and deliver it to the owner.