♂? Supervisor installation
The installation of the supervisor must be carried out at the position indicated in the design drawings, and there must be no error; The supervisor must do heat preservation; The main pipe shall be installed horizontally and vertically; Supervisors shall be fixed firmly with pipe clamps; After the installation is completed, the supervisor shall carry out inhibition test.
Installation of water separator
The water separator should be installed horizontally; Wipe the oil-water separator clean after installation; Pay attention to the connection of water supply and backwater; After installing the water separator, it is necessary to mark the heating area of each circuit.