Year-end personal work summary of architectural design 202 1 (1) I transferred from xx site to xx industrial park. Looking back on my work in the past year, with the support and help of company leaders and colleagues, I have been strict with myself and completed my work well according to the requirements of the company. Through nearly 202 1 year's study and work, there has been a new breakthrough in working methods and great changes in working methods. The work in the past 202 1 year is summarized as follows:
I. Professional knowledge, working ability and specific work
I came to work in xx Industrial Park in xx, and I am a civil engineer. This is both an opportunity and a challenge for me. Because I used to work in a small construction company, but I have never worked in a big company like ours, I am not very clear about our company's workflow, working mode and working method. At first, I was under great pressure. In this case, in order to do a good job, I am not afraid of trouble, ask the leaders, learn from my colleagues, and explore the practice myself. In a short time, I became familiar with the work, completed the role transformation process, defined the working procedure and direction, improved my working ability, and formed a clear working idea in specific work, so that I could carry out my work smoothly and finish my work skillfully and successfully. In more than a year, with the goal of "doing better", I have cultivated the sense of innovation and successfully completed the tasks assigned to me by the company.
1. structural parts
1) Before the commencement of construction, the construction unit shall prepare the professional construction plan in strict accordance with the requirements of design drawings, and prepare the operation instructions for key points, which shall be implemented after being confirmed by the supervision unit. At the same time, in the process of construction preparation, technical disclosure should be made to the team, and the team should be clear about the construction content and strictly abide by the construction specifications. During the construction process, do a good job in the "three inspections" of team self-inspection, re-inspection and full-time inspection, and at the same time do a good job in quality inspection and evaluation records, hidden records and related quality assurance materials;
2) During the construction, the finished products, semi-finished products and raw materials shall be strictly controlled, and the factory certificate and product manual must be available. If the certificate is a copy, it is valid only if the person in charge of the original storage unit seals the copy. If there is a second interview requirement, the second interview report must be made by witness sampling according to the specification requirements, and it can be used only after it is qualified;
3) In the process of steel bar processing, if it is found that the welding performance or processability of steel bar is obviously poor, it is also necessary to carry out chemical composition inspection, and handle it in time if there is any problem. All welded joints and mechanical joints of steel bars shall be inspected in strict accordance with the corresponding specifications;
4) In the construction process, I strictly follow the requirements of drawings and design changes, and the processes of steel bar binding, welding, molding, shuttering and concrete pouring all conform to the Code for Construction and Quality Acceptance of Reinforced Concrete Structures and the requirements of the Engineering Supervision Department;
5) The foundation storage column and cast-in-place surface shall be covered with film and straw bag for water storage and maintenance. The construction quality of the main reinforced concrete structure is good, and it was rated as excellent in Jinan by xx Quality Supervision Station.
2. Building part
1) Before the commencement of construction, the construction unit shall prepare the professional construction scheme in strict accordance with the requirements of design drawings, and prepare the operation instructions for key points, which shall be submitted to the construction unit for examination and approval, and implemented after the supervision unit confirms. At the same time, in the process of construction preparation, technical disclosure should be made to the team, and the team should be clear about the construction content and strictly abide by the construction specifications. During the construction process, do a good job in the "three inspections" of team self-inspection, re-inspection and full-time inspection, and at the same time do a good job in quality inspection and evaluation records, hidden records and related quality assurance materials;
2) Strictly control the finished products, semi-finished products and raw materials during the construction process, and must have the factory certificate and product specifications. If the certificate is a copy, it is valid only if the person in charge of the original storage unit seals the copy. If there is a requirement for a second interview, a second interview report must be made according to the requirements of the specification, and it can only be used if it is qualified. After the main equipment, materials, finished products and semi-finished products in the project enter the site, we immediately notify the construction unit and supervision unit for acceptance, fill in the material inspection form in time, and provide relevant quality certificates of materials according to the requirements of design drawings and construction acceptance specifications;
3) Strictly control the inspection items of materials. The volume stability of cement must be tested before use. In the process of using cement, if it is found that it is caked by moisture or has been more than three months, it is strictly forbidden to use or lower the label after laboratory appraisal. In addition, the three tests of glass curtain wall, stone curtain wall and plastic steel door and window all meet the requirements;
4) Rachel reinforcement of brick masonry shall be constructed in strict accordance with design drawings and construction acceptance specifications, and hidden records shall be made at the same time;
5) The construction period of this project is 20xx to 202 1 year. In the construction, the requirements of drawings, design changes and corresponding construction quality acceptance specifications are strictly followed, among which building masonry, external wall plastering, ground plastering, door and window installation, architectural decoration, roof and bathroom waterproofing are all carried out in accordance with the design drawings and corresponding construction quality acceptance specifications, and the overall project quality is good.
Second, work attitude and hard work.
Love your job, be able to treat every job correctly and seriously, and seriously abide by the company's rules and regulations. Make effective use of working hours, stick to your post, and need to work overtime to finish the work on time, so as to ensure that the work can be completed on time.
Three. Work quality, achievements, benefits and contributions
Make a personal work plan before the start of the work, give priority to all the work in time, achieve the expected effect, complete the work with good quality and quantity, and have high work efficiency. At the same time, I also learned a lot at work and exercised myself. Through unremitting efforts, I have made great progress in my work, created a new situation in my work, and made due contributions to the work of the company and departments.
Summing up the work over the past year, although some progress and achievements have been made, there are still some shortcomings in some aspects. For example, there are not many creative work ideas, and individual work is not perfect enough, which needs to be improved in future work. In the future work, I will seriously study the company's rules and regulations, strive to raise my ideological consciousness and work efficiency to a new level in an all-round way, make full use of my rich construction management experience, strengthen on-site production management, technical quality management and civilized construction management to adapt to the development trend of the construction market environment, adopt advanced scientific management concepts, and combine advanced technology and management experience with advanced management technology at home and abroad to form my own independent technical advantages. Make more and more contributions to the development of the company.
Year-end Personal Work Summary of Architectural Design 202 1 (II) In the past year, with the care and guidance of the leaders and the support and help of my colleagues, I have diligently and practically completed my work, successfully completed all the tasks assigned by the leaders, and improved in all aspects. Now I will summarize my study and work this year as follows:
In order to better adapt to the requirements of the new situation of talent work and fully implement the requirements of Scientific Outlook on Development, this year I paid close attention to business study, earnestly studied new policies and regulations on labor and personnel related to work, learned their good experiences and methods from senior leaders, and further improved my business knowledge and ability.
It is not enough to master your own work and business unilaterally. Usually also pay attention to learn from other business units, familiar with various work processes. Through more study and contact, I have improved my professional level and work efficiency, so that I can better serve the enterprises and the masses.
First, adhere to the warm and meticulous service and earnestly complete all the work.
In the daily work of the center, I can strictly abide by the rules and regulations of the center and conscientiously complete the tasks assigned by my superiors and leaders. Can also abide by the purpose of serving the people, polite and enthusiastic, patient and meticulous.
"The road is long, Xiu Yuan, Xiu Yuan, and I will go up and down." Working in a company is not that simple. I must do my best. I know my ability is still insufficient, but no one is perfect. I should keep working, not do it all at once. There will be many thorns and roads on the way forward. In the next year, I will continue to work hard.
Second, we must have a professional design level.
Then you need to strengthen your professional design level. Then what is a major? Start with a door, or home improvement, or restaurant, or hotel, choose a door and follow suit. No matter what kind of interior design is space design, so functional planning, color, lighting, material, modeling and technology are the core contents you mainly master. This is what you use repeatedly in your design. If you don't even know the normal illumination of a bedroom, and you don't have a clear concept of the influence of lighting on the color of materials, then you still have a long way to go before designing.
Auxiliary and essential are human history, ergonomics, visual or spatial psychology (which can be understood as Feng Shui). Design is not to draw beautiful renderings, but to draw standard construction drawings. Design is to plan what will be implemented in advance.
202 1 I can't say that my work is perfect, but I want to say that I have tried my best. Although I know I still have shortcomings, I am constantly correcting and I will do better.
Year-end Personal Work Summary of Architectural Design 202 1 (3) I was recruited to work in the Engineering Department of xx Office of xx Group Company on X+0. From school to engineering construction unit, although my job position and role have changed greatly, and it is my first time to contact with project management and xxx budget software, with the care of leaders and the help of colleagues, with my professional foundation and work experience, plus hard study and research, I quickly adapted to the working environment and achieved certain results. This work is briefly described as follows:
I. Main Work Achievements and Achievements
1, strictly abide by the company's rules and regulations. At the beginning of my work, I carefully studied the detailed rules of engineering quality management and kept them in mind, reminding myself to strictly abide by the company's rules and regulations and maintain the company's image.
2. Seriously study all kinds of specification documents. From the initial guide to file compilation, including technical disclosure list, standard implementation table and quality system implementation guide, to various specifications and procedures such as Building Construction Manual, Building Construction Quality Common Diseases Prevention Manual and Engineering Quality Acceptance Rules; In addition, there are documents such as the Bidding Documents and Bidding Documents for xx Hotel Project Construction, the Bidding Documents and Bidding Documents for xx Hotel Project, and the Guidelines for Bidding Preparation of Housing Construction and Municipal Infrastructure Project.
For a newly graduated student, although he worked as an intern on the construction site for more than a month at school, what he learned in the real construction process is only rare. So since I entered the company, two seniors from the engineering department have taken me to various construction sites. The time when I followed them to check the quality, safety and civilized construction was the best time for me to learn knowledge and sum up experience, and it was also the most comprehensive stage for me to learn at the construction site. So I sincerely thank them for their teaching, teaching and care.
4. Seriously study the budget information of Liaoning Province. First of all, I have made a serious and systematic study on the budget information and valuation list specification of Liaoning Province, and adhered to the actual calculation practice while studying. When I bid for the xx project, I participated in the preparation of technical tender and calculated the construction drawing of building 1 1. Because the graduation project of the university is to prepare the tender, I quickly mastered the essentials. Although I haven't really had a chance to finish the task by myself, I personally think I already have some. At the same time, I also learned to use "xx Budget Software" to prepare budget and calculate reinforcement. Through the budget practice of xx construction drawing, although it is the first contact, it has made great progress and can be operated independently. In the future work, I will continue to explore and learn, and make my work more detailed and perfect.
5. Other aspects:
(1) In liUXue86.Com, I insist on going to work early every day, cleaning the office and creating a clean working environment for my colleagues.
② Manage the storage of some documents in the office so that they can be found in time when necessary.
(3) register some items for future reference.
④ Actively discuss cost control, contract management and data management with colleagues in the branch. Through discussion, we not only enhanced the friendship between colleagues, but also improved our ability.
⑤ Actively communicate with colleagues and help others enthusiastically.
Second, the direction of efforts
1, considering the limited scope of work of lesbians in construction units, it is more necessary for them to recharge their batteries, concentrate on the direction of bidding, accumulate bidding experience, strive to pass the national qualification examination for cost engineers while meeting the requirements of working years, make full use of the advantages of passing the national qualification examination for cost engineers and previous work experience, actively contact with various related businesses, improve their practical operation ability, and make contributions to the company's bidding negotiations if possible.
2. Actively participate in the certificate examination, learn professional skills, and improve business ability and professional level;
3. Play an exemplary role and strive to be advanced.
Summarizing the work in the past year, I personally think that some achievements have been made, but there is still a certain gap from the requirements of the leaders. Find out the shortcomings in the work so as to overcome them in the future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time.
In short, in the future work, I will constantly sum up and reflect, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises and make progress and growth together with the company.
Year-end personal work summary of architectural design 202 1 (4) I am currently working as a builder in xxx company and have worked in the construction front line for X years. In the long-term work, I have developed the habit of hard work. I love construction management, work actively, and study construction technology hard. As a builder who has worked for many years, I have been constantly enriching my professional knowledge and being pragmatic. While completing many projects, I also improved myself to some extent and achieved myself. Now I have summed up a series of my own growth and shortcomings, hoping to face my works with a newer and stronger look in the future. The work is summarized as follows:
First, the implementation of post responsibilities
As the manager of the project department, I attach importance to controlling the construction quality of the project, coordinating the relationship with the construction unit and supervision unit, coordinating the management of the team, automatically cooperating with the security department to complete various safety management work, paying close attention to material management and saving the project cost. It is important to clarify the following aspects:
1, project quality management
Every construction project requires a high standard and a high starting point. In the early stage of construction, pay attention to the technical disclosure of the team, pay attention to the team members ideologically, and technically understand the quality, progress and safety requirements of the project to lay a good foundation for the later construction;
2. Team management and coordination
Attach importance to the training of each team leader. At every meeting, in view of the problems existing in construction cooperation, I try to let each comrade take the lead at least once to increase experience, so that each comrade can be independent and deal with various problems, thus improving the overall business skill level of each team;
3, safety management work
In the process of work, it is an inseparable part of every project management to automatically cooperate with the Security Section to complete the safety management and education of construction personnel.
4. Coordination with the construction unit and supervision unit
As a construction manager, paying attention to the coordination with the construction unit and supervision unit in each project, taking the lead in studying and implementing the good suggestions put forward by the construction unit and supervision unit, and striving for the unanimous praise of the construction unit and supervision unit is the embodiment of the continuous progress of the builder's work;
5. Technical management
The requirements for construction technology are more stringent. We must study the construction drawings and specifications carefully to ensure the construction quality. At the same time, it is necessary to record the construction points, construction methods and punishment regulations, so as to ensure that there is no omission in technical disclosure and try to anticipate and solve it in advance. In view of some key problems, specific requirements should be put forward to the construction team at the beginning of each construction stage, with special emphasis on the seriousness of the problems, and the requirements in the specification should be patiently explained to them.
Second, the problems existing in the work
1, for its part, sometimes it is not comprehensive enough to consider the problem, blindly listen to the opinions of the construction team, and draw conclusions without making a clearer and more detailed analysis of the incident, resulting in unnecessary losses. In management, there is no severe punishment for teams that don't listen to instructions and do things according to requirements. Over time, individual construction teams will be lucky, so that the management is out of control in the later management work, which leads to difficulties in work arrangement and on-site management. In the future management work, we must first make clear our own position, give full play to the leading role of the project manager in the construction site, make clear the rewards and punishments for the construction team, form a leadership method centered on the project department, and never be soft on those construction teams who don't listen to the command and establish the construction prestige.
2, in terms of construction technology, due to the lack of construction experience. In the construction site, we can't find the problems in the construction accurately and quickly, and we can't use the construction drawings and construction specifications flexibly and skillfully, which derails the actual construction process from the theoretical construction, that is, we can't achieve the expected construction effect, which complicates the construction procedure and increases the construction cost. This taught me that I must not do whatever I want in the future construction process. I must be familiar with the construction drawings and construction specifications carefully and master them well, so as to better apply the construction specifications to the site construction.
III. Future Work Plan
By summing up the past work, we can find out the shortcomings in our work so as to overcome them in our future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time.
In short, in the future work, I will constantly sum up and reflect, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises, and make progress and growth with my favorite construction career.
Summary of personal architectural design at the end of 20021(5) In the interweaving of maturity and confusion, 202 1 quietly passed away. In my eyes, the design room is also a battlefield without smoke, which can temper people's will, indifferent people's hearts, quickly improve their professional quality and mature people's psychology, all of which embodies the famous decision-making and correct guidance of every leader.
At the end of the year and the beginning of the year, people always lament the waste of life. Retrospect and prospect will be two eternal themes. Below I will analyze my gains and losses in the past year from two aspects: professional quality, external communication and internal cooperation.
As an architectural professional designer, the promotion of professional ability is the most important.
202 1 Through a large number of construction drawings, we have a deeper understanding of the process and methods of architectural design, and also have a certain understanding of building codes. At the beginning of this year, I set myself a goal to be able to operate a general project independently, including its overall planning, scheme design, rendering performance and later construction drawing design.
Ability comes from practice, and practice tests ability; Over the past year, I have been walking down-to-earth step by step according to my established goals, some of which may have been achieved, and some may still have a certain gap from the goals, which are embodied in the following aspects.
First, overall planning ability.
202 1 Through the master plan of xx residential district in X county, the master plan and design of xx residential district, the master plan adjustment of X commercial center and the master plan of X commercial and residential district in downtown, we have a deeper understanding of planning knowledge and a certain practical ability. In order to facilitate communication with Party A, I try to know more about the trends and trends of real estate development, guess the commercial purpose of developers with my heart, and try to find the perfect combination of designers and developers. As a designer, he mainly controls the floor area ratio, building density, greening rate, building height and spacing through the current national norms and local government departments. Secondly, the determination of basic column network, the connection between fire escape and residential road network, and the choice of architectural style are also several problems that a mature designer must skillfully solve. I pay special attention to the above problems in my work and handle them properly. Ask leaders and senior experts modestly when encountering problems, which has achieved good results and accumulated a lot of valuable experience.
Second, the performance of the renderings
As a means of expression, renderings are the most intuitive expression of architectural design works, which determines the overall style of the building and is also a very important reason for developers to choose the overall scheme. Therefore, I think the performance of renderings is a very important part of the early stage of architectural design, and it is a basic skill that I must master. Over the past year, I have mastered 3dmax, photoshop and other design software by making renderings of garrison guest house, overpass attached to xx building, xx hotel and xx single-family villa, and I can make general single renderings with my own understanding of architectural forms. The aerial view of large commercial buildings and residential areas is still lacking, and I still need to study and practice continuously.
Three. Programme capacity
Planning ability is an important ability that an architect should have. Good plane planning is directly related to the three basic elements of architecture: applicability, economy and aesthetics. Over the past year, I have participated in the design of most of the company's projects. During this period, entrusted by the leader, I also independently completed the plane elevation design of the garrison guest house, xx single-family villa and department store, 1 and 2# building.
On the layout of the plane column network, I first arranged the structural column network roughly according to my own ideas, and then asked my colleagues in the structural group to help me check whether it was reasonable. Invisibly enhanced the concept of structure and enriched professional knowledge. In the process of independent design, I found many shortcomings of myself, especially the lack of basic theoretical understanding of the negative scheme, which must be strengthened first in the future work.
Fourth, the construction drawing design
Construction drawing is the follow-up of scheme design, which introduces architectural design from macro to micro, from control to restriction. Make architectural design works closer to life and facilitate construction. This requires designers to improve their life experience and have a thorough understanding of building codes. Through a large number of construction drawing designs for more than a year, from ordinary houses to commercial buildings, from civil buildings to industrial buildings,
From multi-storey to high-rise, from the initial drawing group to the later drawing study, and then the independent operation, xxx's handy, witnessed his own growth from scratch, from confusion to clarity, and basically had the ability to operate independently, which can solve some common problems in construction. Over the past year, I have been familiar with almost all the company's building codes and related materials, and made detailed study notes. Although a lot of knowledge will not be used for a while, I have learned it. When it comes to using it, there will be no sigh of "using the book". The difficulty of building construction drawing design lies in roof drainage and node details. In these respects, the master of the design institute has given us a lot of help. Roof drainage lies in organization and guidance, and roof drainage should be given priority in roof practice. The joint details should be light and beautiful, and easy to construct. As the saying goes, there is no end to learning. I still have many misunderstandings in construction drawing design, and there are still many places to learn and strengthen. Such as the design of underground garages and civil air defense projects; A deep understanding of the fire protection code of high-rise buildings, the understanding of the clear height of stairs, the layout of kitchen and bathroom must meet the needs of humanization and so on.
In addition to the cultivation of professional quality, communication with Party A, cooperation with colleagues and communication with the construction party are also essential parts of the work.
Design is the work that runs through the whole project. In the early stage of design, we are committed to communicating with Party A to understand the business intention of the developer through our professional sense of smell. It is our consistent position to be humble and polite. In the middle stage of design, it is necessary to cooperate with professional and related professional. As the forerunner of other specialties, architecture specialty must take full responsibility for the whole design process. In my opinion, friction is always inevitable in cooperation, but we must have a good attitude; No matter whether the type of work is the same or not, the position is high or low, we should adopt a learning attitude, an open-minded spirit, a soothing tone and a convincing attitude; Any self-righteousness and arrogance will lead to internal contradictions, affect the combat effectiveness of the whole team, and then slow down the progress of the project. In the later stage of design, we should communicate with the construction party constantly, no matter what the result of communication is, it will be beneficial to our future design. If it is our problem, we must dare to admit it and correct it quickly. It's not our fault, but we should explain it in detail.
In order to improve my comprehensive quality, I have read many biographies of famous people, gained nutrients from the experiences of great men and further enriched myself. I read a lot of literary works and improved my appreciation ability. I also studied the ethical philosophy of dealing with people to improve my moral cultivation. All these make me feel the meaning of life pursuit more and more deeply.
I don't know if I'm asking too much or I'm making too little progress. I always feel that I am still so far from my goal. And the longer you work, the more you learn, and the more you feel inadequate. In short, achievements belong to the past and mistakes have become experiences. In the future work and life, with the continuous expansion of the company and the growth of business volume, we will still face great challenges and pressures. Personally, I think there are several points that need special attention.
First, strengthen the cultivation of their own business ability, increase their proficiency in all aspects of design, suffer more, think more, and strive to improve work efficiency;
The second is to enhance the sense of urgency and competition with peers, and create an atmosphere of chasing after each other. If you don't study and make progress, you will be eliminated by society;
Third, we should strengthen unity and cooperation with designers in the company, maintain a peaceful attitude, communicate and cooperate more, and fully tap the collective potential.
Finally, I want to say one word: responsibility.
Countless times, I used this word to measure myself and demand myself. No matter what you say or do, you should take responsibility. It is inevitable to shoulder the responsibilities of work, society and family.
The new year is coming. I believe that under the famous decision-making and correct guidance of the company's leaders and the joint efforts of all employees, the company's development will surely flourish. I have no reason not to look forward to the future.