1. How much do you know about the renovation period?
Factors affecting the length of decoration period before decoration
The renovation period of the house is about 100 square meter.
Second, why is the decoration delayed?
It is only because "workers are too popular" that the completion time of home improvement was postponed to February.
The transformation plan is constantly changing.
Main materials failed to enter the site on time.
Acceptance is not on time or the project payment is not settled in time.
Rework caused by unqualified construction quality.
Third, how to vaccinate the decoration delay?
Choose a professional decoration company
Pre-renovation planning in advance
Timely acceptance and settlement of project funds
When signing a contract, you should make clear the relevant terms.
Fourth, how to solve the renovation delay?
Distinguish the reasons for the delay in renovation and the responsible party.
Act according to the contract
Fifth, some other little knowledge about the decoration period.
How long does the construction period take?
How to calculate the construction period?
What should I pay attention to during the renovation shutdown?
Don't worry about the length of the renovation period.
I bought a new house, of course, hoping to move in as soon as possible. The length of the renovation period has become a special concern of the owners. Due to the differences of some objective factors such as decoration area, the length of decoration period is not the same. There is always a reference to know the difference. Let's take a look at the renovation period.
First, the factors that affect the length of the decoration period before the decoration
1, the size of the decoration area
Generally speaking, the larger the decoration area, the longer the decoration time. /kloc-an ordinary apartment of 0/00 square meter may be renovated in more than a month, while villas of several hundred square meters may not be completed in half a year.
2. How many renovation projects are there?
The quantity and complexity of decoration projects will obviously affect the length of construction period. There are many factors that affect the number of decoration projects, such as the situation before the house decoration, decoration style, decoration budget and so on. Generally speaking, the construction period of second-hand houses may be longer than that of rough houses, because there is still a demolition work for second-hand houses. In addition, for example, simple house decoration is generally simpler than Mediterranean and European decoration.
I. Subtitles
Second, about 100 square house renovation period
The formulation of the decoration period needs the consent of the owner and the decoration company. Although there is no clear length of time, at present, many families adopt a relatively simple decoration style, and decoration projects are also common. Therefore, taking a flat 2-room house with 100 as an example, the renovation period is generally not much different from the following arrangements.
1, structural demolition and reconstruction: 1-2 days.
Before house decoration, the structure is generally removed according to the design scheme, and it usually takes 1-2 days for small and medium-sized units. If there is no such item at home, you can subtract this time.
2. Hydropower transformation: 5- 10 days.
Hydropower transformation, such as slotting, wiring and pipeline laying, acceptance, etc. Generally, it takes 5- 10 hours, sometimes even longer, depending on the complexity of the project.
3. Tile works: about 10 days.
Mud tile engineering includes waterproofing such as kitchen and bathroom, tile laying and other projects. According to the size of tile laying, the time required is different. It usually takes about 10 days. If the waterproofing fails to pass the acceptance, the time may be longer.
4. Woodworking project: about 10 days.
Woodworking projects include suspended ceiling foundation, floor foundation, wooden background wall and furniture making. A long time may take 20 days, and a short time may not need 1 day because all finished furniture is used and there are no wooden items.
5. Painting works: about 10 days.
Paintings mainly include painting walls and ceilings, pasting wallpaper and so on. Because the paint generally needs to wait until the putty is dry before brushing the primer and topcoat, and sometimes it needs to be brushed several times, the construction period also needs about 10 days.
6. Final installation: about 10 days.
The final stage of installation includes the installation of various sanitary wares, the installation of floors and cabinets. Because there is no conflict and influence, these installations can be carried out several times a day. So if the product comes into the market in time and is installed reasonably, it can be done in a few days.
Taking the most common apartment type as an example, the time required for renovation of each project is listed. Calculated, it takes about 30-60 days to decorate a house of 100 square meters. When calculating the construction period of decoration, the owner needs to proceed from the actual situation and reasonably calculate the construction period, which will not only affect the harmony of construction, but also affect the quality of home decoration.
It is only because "workers are too popular" that the completion time of home improvement was postponed to February.
Ms. Wang said that the construction team entered the venue for renovation in early March. "My home is a two-bedroom second-hand house with a small area. At that time, the decoration company told me that it would definitely be completed in May. The result is not over yet, and the painter enters the scene. " Ms. Wang told reporters that the renovation was originally planned to be completed in May, which happened to be used as a wedding room when her son got married in 5438+ 10. Now the decoration company told her that it would not be completed until mid-July, and 10 definitely couldn't live any longer.
In this regard, the relevant person in charge of the decoration company told the reporter that Ms. Wang was renovated during the prime time of "Golden Three Silver Four". At that time, customers started working intensively, and the construction team could not get up. In addition, the materials of Ms. Wang's family were not in place in time, which caused the delay.
"When my home was renovated, no workers came to the construction site for a week because there was no bricklayer to call." Miss Su told reporters.
Subsequently, the reporter learned from the decoration companies such as Shichuang Decoration and Face-to-Face Decoration that when the construction team enters the site, it is generally subject to the following single time. If there are multiple orders in front, only the construction team can coordinate the commencement. Therefore, if you want to start work in advance, you have to place an order in advance.
The construction period of workers in July and August is still full.
July and August are the traditional off-season of home improvement, but zhangqian, the head of Shichuang Decoration Nanjing Company, told reporters that there is no so-called off-season in the home improvement market now, and the construction period of their workers in July is almost full. "This time limit for a project is full, which means that all workers have jobs and are not idle. Of course, it can't be compared with the Spring and Autumn Period, and workers are overloaded in the Spring and Autumn Period. "
Some decoration companies are also using the so-called off-season to recruit people. The reporter saw on a recruitment website that a decoration company in Jiangning, Nanjing recruited bricklayers and painters, and the monthly salary was between 5,000 and 8,000 yuan. Moreover, the decoration workers who have worked for five years are really popular, and the employment rate in the future is not bad, even abroad. The Bureau of Labor Statistics of the United States recently released the list of "20 fastest growing occupations from 20 10 to 2020", among which bricklayers and carpenters both made the list, ranking in the top five, with the employment growth rate of 56% and the labor cost accounting for about 20% of the total expenditure.
Not long ago, Mr. Liu renovated his old house. "There are 2 wardrobes, 2 wooden doors and 3 sliding doors, and the area of 60 square meters should be painted. The painter couple came to work for 2 days, and the labor cost was 2,000 yuan. " Mr. Liu told reporters that the painter came to touch up the paint the day before yesterday and told him that he had another job like his home, which was also 2,000 yuan for 2 days. "The painter's monthly income is obviously over 10,000 yuan, but the degree of hard work is really unbelievable. I can't stay in the house for a moment while painting. "
Some netizens even listed their own list of decoration expenses. 100 square meters of housing and cleaning workers in the total decoration costs, labor costs accounted for nearly 40 thousand yuan. "This is a special case. In general, labor costs are not so expensive. It accounts for about 20% of the total cost. " Zhangqian, the person in charge of Shichuang Decoration Nanjing Company, told the reporter that if the master workers are skilled or the workers are in short supply, the charges will not be ruled out.
Changing thinking and reducing decoration cost
Insiders pointed out that the rising wages of decoration workers are related to the fiery real estate market, and now employees in the decoration industry are quite scarce. Since 2008, the supply of decoration workers has been in short supply, especially in the peak season.
"In autumn, due to the dry climate, boards are not easy to regain moisture, and paints and coatings are also easy to dry. Many owners will choose to get together for decoration this season. However, if you decorate in autumn and place an order in autumn, it will definitely be too late. " Zhangqian said that finishing the renovation in the peak season will not only lead to high cost, but also lead to the lack of good renovation workers, and the quality of the project cannot be guaranteed. If you choose to avoid the peak season, not only the labor cost will be much cheaper, but also there will be sufficient labor, more space to choose a satisfactory master, and the decoration quality will be more guaranteed.
I hate the delay in renovation. Five reasons are the culprit.
The waiting process is always difficult, and it will really make people crazy if the construction is postponed during the renovation. Philosophically speaking, "existence is reasonable", then what is the reason for the delay in construction period?
No reason: unreasonable process arrangement or worker deployment.
Decoration is a complex project, which needs to integrate various resources to realize the integration process of design, construction and home configuration. In this process, the things that need to be done are trivial and complicated, and it is necessary to choose a decoration company with excellent management ability. Many renovation delay projects stem from many home improvement companies' one-sided pursuit of orders without reasonable analysis of their own scheduling ability for construction and installation, which eventually leads to many projects being out of touch with the agreement in implementation.
Reason 2: The renovation plan has been changing.
After the start of construction, the constant change of decoration design scheme is also a major reason for the delay of decoration. Among them, some changes were not clearly confirmed by the owner in the early stage, and only after construction did they feel inappropriate and asked for changes; There may also be decoration companies that increase their budgets for various reasons, designers or construction teams.
Reason 3: The main materials failed to enter the site on time.
At present, many owners choose semi-package decoration. The decoration company is responsible for the construction and foundation auxiliary materials, and the main materials need to be purchased by the owners themselves. If the main materials cannot enter the site on time, the construction time may be postponed. In addition, decoration workers may continue to delay the construction period because the construction progress is disrupted.
Reason four: the acceptance is not timely or the project payment is not timely.
In the decoration, some projects, such as hydropower projects, need the owner's acceptance before the next step of construction can be carried out. And many times, because the owner is very busy, he can't go to the site to sign for confirmation, so the acceptance time will be postponed; In addition, some renovation projects are paid in installments. If the owner fails to settle the phased project payment in time, it may stop work and postpone the renovation.
Reason 5: Unqualified construction quality leads to rework.
In the decoration, the owner found that the construction party shoddy, unqualified acceptance will require rectification, therefore, it will inevitably cause delays in the construction period and affect other processes or types of work.
It is the key to postpone the decoration and have countermeasures.
Renovation cycle is a problem that owners are very concerned about in the process of renovation, but the phenomenon of renovation delay is widespread. Seeing that the renovation time is prolonged day by day, the owner's psychology and economy are tested. We set the time back to before the renovation began. What does the owner need to do to avoid the delay of renovation in the future?
Countermeasure 1: Choose a professional decoration company.
If the owner is in a hurry to move into the new house, he may choose a decoration company with a short construction period, which is mixed with many bad construction teams. In order to sign the bill, promise if you don't know clearly, and then find various reasons for the owner to sign the decoration extension bill or pay attention to the decoration quality in the process of construction. Therefore, it is suggested that the decoration should not be eager for quick success, and it is best to choose a professional decoration company with good reputation, even if the delay will not be too long.
Countermeasure 2: Plan in advance in the early stage of renovation.
In order to avoid the delay of decoration caused by the situation during the construction period, the owner must make a detailed plan for this decoration. Clarify and communicate all aspects of things, and rationally plan work arrangements. Specifically, it is necessary to do the following work in advance:
1. Say hello to neighbors before renovation and go through the formalities for property renovation in advance;
2. Fully and thoroughly communicate with the decoration designer to completely determine the decoration scheme. Once the plan is determined, don't change it easily;
3, do a good job in market research, determine the grade and style of decoration materials, try to order building materials in advance to ensure that materials can enter the market on time;
4. Communicate the design scheme and matters needing attention with the construction party, and try to ensure the information symmetry of demand, design scheme and construction execution.
Countermeasure 3: Timely acceptance and settlement of project funds
After renovation, in case of some projects that need the owner's acceptance and signature, the owner had better arrange the time reasonably to prevent delay. In addition, it is also necessary to prepare for the project payment to prevent the work stoppage caused by not paying the project payment in time.
Countermeasure 4: Make clear the relevant terms when signing the contract.
The delivery time of the home improvement project shall be subject to the contract agreement between Party A and Party B. If you don't want to be delayed and have nowhere to complain, you must indicate the specific amount and details of the breach of contract in the terms of the contract, and then strictly follow the contract. Generally speaking, the owner can consult the regular companies in the city for the reference of liquidated damages, and then judge whether the selected decoration company gives a proportion of liquidated damages that is relatively in line with the interests of buyers and sellers in the contract.
Matters needing attention in contract signing: It should be reminded that when signing a contract with the construction unit, the owner needs to sign the liability for breach of contract and related compensation liabilities. It is best to determine the specific amount of liquidated damages paid every day. If it is filled in proportion to the total project price, it is best to calculate the specific amount equivalent to the daily amount. The amount of liquidated damages is too small, which may not achieve the binding effect.
I have a way to make Mochow postpone the renovation.
Mr. Chen of Xiuyi Garden told us that they had planned to live in their new home before the New Year, but now that New Year's Day has passed, the renovation progress is only half completed. It's impossible to move in before next year, and we'll be grateful for the basic renovation before the Spring Festival. Further understanding, Mr. Chen's decoration is just the peak season, and there are few construction workers, and it is not every day. Although I have communicated with decoration companies and decoration supervisors many times, the effect is not ideal.
Decoration delay is the last thing owners want to see, but when problems arise, many owners don't know how to solve them. On the one hand, many owners lack sufficient awareness of rights protection and related knowledge, on the other hand, decoration companies shirk their responsibilities or "play hooligans". Of course, the extension of the construction period is not necessarily the responsibility of the decoration company, but may also be caused by the owners themselves. So, what if the construction period is extended?
First of all, distinguish the reasons and responsible parties for the renovation delay.
To solve the problem, we must first analyze the reasons, that is, we must first analyze the reasons for the delay. This is a step that must be fully understood, because it is related to responsibility. It is necessary to see clearly what is the reason for the delay of the decoration company and see if it is caused by its own reasons.
1. Owner's breach of contract: the owner fails to complete the corresponding work as agreed, fails to provide materials to enter the site in time, or fails to accept and sign the materials in time due to quality problems, and fails to pay the project payment on time as agreed in the contract.
2. Breach of contract by the decoration company: the decoration construction unit failed to start work on schedule, stopped work without reason, and the materials provided were reworked or rectified due to quality problems, which led to the delay of decoration.
Second, act according to the contract.
Delays in home decoration are extremely common. In the eyes of many consumers, it is normal to delay the construction period for ten days and a half months, and it is not uncommon to delay for about one year. However, few people ask for liquidated damages. Many consumers think that they need to find a decoration company in the future warranty and don't want to entangle with them too much. One more thing is better than one less thing. If the decoration delay is caused by the decoration company, the owner should act according to the contract and strive for his legitimate rights and interests.
The contract stipulates the compensation for renovation delay: if the specific amount and details of breach of contract are stipulated in the renovation contract, it shall be strictly implemented in accordance with the contract.
The contract does not specify the compensation for decoration delay: when signing a contract with the owner, the decoration company sometimes deliberately ignores the decoration delay. If there is a delay, the decoration company may deny it and will not compensate. However, this situation can also be solved through negotiation, third-party mediation or litigation.
Supplementary contract: foreseeable renovation delay. If it is determined that the construction period is delayed due to the construction party, and there is no delay breach clause in the contract, the owner can mend it after it is late, sign a supplementary contract, and increase the delay compensation clause.
How long does the construction period take? And look at the time summary of each stage.
I thought I would be able to live in a new house in half a year, but as a result, the construction period was extended again and again during the renovation, which led to the late occupancy time, especially in the new house, which would cause a lot of inconvenience. At the same time, intangible costs have also increased. There are two main reasons for the extension of the general construction period. One is the malicious delay of the decoration company, another common reason is that they have no clear plan, and there are other factors that lead to the delay of the construction period. Today, Bian Xiao will sort out how long it will take for everyone to decorate each link.
First, structural transformation: smash the wall to build the wall and remove the slag (usually 2-3 days).
If the apartment you buy is not square and you don't avoid all kinds of feng shui, then you can only change it later. Demolition and renovation are generally designed to demolish walls, pile walls, demolish floating windowsills and pile floating windowsills.
It takes about 1-2 days to demolish and change the apartment within 90 square meters, and it takes about 2-3 days to change the concrete wall slightly. If you don't have this at home, you can subtract this part of time.
2. Hydropower renovation, slotting and pipe laying (at least 5- 10 days)
The contents involved in hydropower transformation include slotting, wiring, pipe laying and acceptance. , inseparable from the construction design drawings, can be modified and adjusted according to the wall structure. According to the complexity of the project, the construction period is about 5- 10 days, and the line layout will be adjusted according to the size of the house.
Note: after the plumber enters the site, you can ask the plumber to write a list of switch panels and lights, and you can buy them as soon as possible!
Three, mud tile engineering, including guarantee, waterproof, brick, etc. (at least 10- 15 days).
To put it bluntly, the mud tile project is waterproof bricklaying.
Waterproofing should be based on the size of kitchen and bathroom area, usage habits, waterproof height, etc. In addition, the closed water test should be carried out after the water is discharged. The time is 2 days (closed water experiment and other space tiling can be carried out simultaneously).
The complexity of tile paving depends on whether it needs cutting and the relationship with flowers, so it takes different time. Infrared positioning is required before laying. And it needs to be dried after paving. The average time is about 15 days.
Note: after the bricklayer enters the site, when waterproofing, a list of tiles should be drawn up. It is best to enter the site 2 days after the bricklayer enters the site, so as not to delay the construction period due to his own reasons!
Four, woodworking projects, including ceiling, background wall, on-site cabinet, etc. (at least 10- 15 days).
Woodworking is mainly ceiling, custom furniture, wooden background wall and so on. A few months, too. Of course, if you choose finished furniture and unused wooden projects, the time will be much less.
Note: when it comes to woodworking projects, you can basically look at the styles and models of things at home, such as toilets, toilets, range hoods, hardware, etc., so as not to be caught off guard when using them!
Fifth, painting works, including wall paint and furniture paint on site (at least 15 days).
Painting project mainly refers to painting walls and ceilings, pasting wallpaper, etc. Putty can only be painted after it is dried, and the next process can only be carried out after it is thoroughly dried every time. So this is also time-consuming!
After completion, if there are some defects, it needs to be polished, repaired and dried. The shortest construction period is also around 15 days.
Sixth, installation works, including hardware sanitary ware and lamps. (5-7 days)
This is up to you to control. You have everything, and it's faster to install. I'm afraid to get some of this today and install that tomorrow, so I started to buy back what I need to install in the later period when I was renovating in the middle period. Be careful not to buy the wrong size!
According to this calculation, it is almost two and a half months. This is the normal construction time of the apartment about 100 square meter. Of course, it is not so ideal in general. It is normal that there may be 1 or 2 days of work stoppage when different types of work are connected.
How to calculate the construction period? What factors may cause the delay?
What are you most afraid of in home improvement? Most owners are most afraid of delay! The planned time is delayed, the wedding day is approaching, and the house has not been installed! This is a farce! Many owners are renovating for the first time, and I don't know how long the renovation cycle will take. The decorator said it was awkward and added a lot of trouble to the back. Today, Bian Xiao will sort out why the home decoration will be postponed and how to calculate it correctly.
First, the decoration time estimation
The general renovation cycle is related to the size of the house. The bigger the house, the longer the renovation time. Of course, in addition to the influence of the size of the area, we should also consider the difficulty of the decoration style you choose. The more complicated and gorgeous the style, the more time it takes to polish it carefully.
/kloc-it takes about 40 days to decorate a two-bedroom apartment within 0/00 square meter.
It takes about 45 days to decorate a three-bedroom apartment of 150 square meters.
It takes about 50 days to decorate a large apartment and duplex of about 200 square meters.
Second, the renovation progress
In the absence of other factors, the general construction time is shown in the above table. However, we must be patient with some basic renovation projects, otherwise the extremes meet, leaving a major hidden danger for our future life.
Third, what decoration matters are easy to delay the construction period?
1, design style
The overall design scheme should be determined as soon as possible, and 3D design renderings should be issued. If there are undecided items, it is likely to affect the overall plan in the later period, and even cause rework and waste time and money;
2. Customization of doors and windows
Doors and windows protect the construction environment and decoration materials (prevent theft), so they should be replaced as soon as possible. The measurement of doors and windows can be arranged together with the measurement of houses by designers. The general customization period of doors and windows is 7 days, so that doors and windows can be replaced smoothly after being dismantled and modified.
3. Customization of cabinets
The first rough measurement of cabinets can be arranged with the designer to measure the house. The general customization period is 30 days. If it is not customized in advance, it will affect the construction of tile laying.
4. Wooden doors, floors and stairs
These three items generally need a production cycle of 30-45 days respectively, and it is necessary to measure and customize them in advance, otherwise the installation progress will be delayed;
5. Furniture and household appliances
Can be purchased early before the renovation is completed, and directly enter the site after the completion to improve efficiency;
6, timely acceptance
Before each decoration construction, the owner shall check and accept the materials. After the construction is completed, the owner shall be present for acceptance in time. After confirmation, workers can carry out technical handover and start the next step of construction.
What should I pay attention to during the renovation shutdown?
Many people don't want to decorate in winter, for one thing, because the weather is cold, and for another, because many decoration workers are going back to their hometown for the New Year. Therefore, when decorating, we often encounter the phenomenon of work stoppage. Of course, we can't decorate before the Chinese New Year just because of the Chinese New Year. In order to take care of the quality of home improvement and ensure the smooth resumption of work after the year, there are still many things to pay attention to before the year.
Part 1: the main points to know before the renovation and shutdown on New Year's Eve.
There were many things that stopped working years ago, so we can't just stop. As the owner, we need to do the following work before stopping work.
First, ensure the completion of individual projects.
You must ensure that all individual projects can be stopped. If a project can't be completed within the scheduled shutdown date, it's better to start after the year. Because of the strong mobility of construction workers, it will be difficult to ensure the unity and integrity of construction technology if the construction workers change after the year.
Second, years ago detailed construction acceptance
Before stopping work, the owner needs to check and accept the stopped project. If there is any problem, write it clearly on the acceptance form and give it to the decoration company. At the same time, ask the other party to have a simple written commitment: when and how to solve the problem.
Third, a shutdown agreement needs to be signed.
The owner should sign a shutdown agreement with the home improvement company before the shutdown, which can effectively avoid disputes. Under normal circumstances, the project manager, workers and owners should close the site and unseal it when the work is resumed. It is best to indicate the time for unsealing and resuming work, the construction period plan and the inventory of goods in the shutdown agreement, which shall be signed by both the project manager and the owner. In order to prevent accidents on the construction site, the owner should also reserve the contact information of the personnel on duty.
Fourth, do a good job of on-site inspection
The Spring Festival is coming, and the house being renovated will be shut down for half a month to one month. During this period, due to the unattended construction site, the use of fire, electricity and gas on holidays increased sharply, and the fire incidence rate was extremely high. Therefore, before the construction site is shut down, attention should be paid to checking wires, electrical appliances and decorative materials, as well as sheathing pipes, doors and windows. Prevent risks such as electric leakage, pipeline frost crack and fire prevention. In short, the construction site inspection before shutdown should be done well to ensure foolproof.
Five, inventory decoration materials
Before the shutdown, it is best for the owner to check and accept the site together with the construction party, register the quantity of items and materials on the site, record indoor water, electricity, gas and other data, and sign them for storage. Generally, the items stored in the construction site include materials provided by the decoration company, materials purchased by the owner, and workers' working tools. Decoration companies usually stack these three materials separately, and owners can check them according to the remarks column of the "Cross-year Project Closing Record Form" filled in years ago.
Part II: Ensure the safety of materials during shutdown.
Before the shutdown, in addition to counting the quantity and model of the decoration materials, the decoration materials should be placed reasonably to ensure that the quality of the decoration materials will not be damaged during the shutdown and affect the use after the resumption of work. Let's take a look at the correct placement of decoration materials during the shutdown.
First, the placement of decorative panels.
Plates need to be piled up in a centralized way, and timber needs to be tied up; For decorative boards and other materials, the back cover oil treatment is needed, and the pattern needs to be neat, flat and dense. If necessary, the decorative board can be clamped with a large core board. All plates should not be placed by the window or in direct sunlight, because the temperature and humidity at the window vary greatly, and the plates are easy to change by the window.
Second, the preservation of paint.
Individual small packages of paint should be sealed and kept in a cool and ventilated place, and the storage capacity should not be too much, and fire extinguishers should be placed in appropriate positions. Finished or semi-finished products should be protected, such as sealing oil and sticking protective film.
The third is the placement of heavy objects such as cement and ceramic tiles.
Heavy objects such as cement, sand, wall and floor tiles during construction should be scattered and piled up, and each square meter should not exceed 150kg. When placing wood, try to place it horizontally and find a suitable balance point to place heavy objects on it. Because there will be two stress points when placed vertically, the wood will be easily deformed after a long time.
Fourth, the placement of flammable items.
At the same time, before the shutdown, the paint and thinner in Kaifeng should be taken away as far as possible, and combustible materials such as sawdust should be cleaned up in time. In addition, plates, plastic bags, packaging bags, paints and other materials should not be placed in balcony windows. This is mainly to prevent the fireworks set off during the Spring Festival from coming into contact with these inflammable and explosive materials.
Fifth, ensure that water and electricity are cut off.
On the day of project shutdown, it must be remembered that the main valves such as water, electricity and gas must be closed and the temporary power supply during construction must be cut off.
Part III: Precautions for downtime years ago
The shutdown agreement has been signed and all projects have been confirmed. So, can you not think about anything and ignore anything during the shutdown? No, if you are a concerned owner, you can make full use of this more than ten days of downtime to think in many ways and make full preparations for the renovation after the year.
First, pay attention to waterproof, fire prevention and theft prevention.
Before stopping work, in addition to asking the construction team to clean up the site before leaving, the owner himself should also go to the site to have a look. If you have time, you'd better visit the site often during the festival. No one lived in the new house during the Spring Festival. Pay attention to theft prevention, lock doors and windows, and ensure the safety of decoration materials and installation objects. In addition, although it is unlikely, we should also pay attention to waterproof and fire prevention.
Second, prepare the materials for returning to work after the holiday
Considering that there is plenty of time during the Spring Festival, the owner can communicate with the decoration staff before stopping work to understand what materials are needed and have time to prepare as much as possible. Because if construction starts early next year, many building materials manufacturers are still resting, so as to avoid the delay of decoration works due to the untimely arrival of materials.
Third, reasonable maintenance.
If some projects have just been completed before the shutdown, there is no time to take care of them. Then, during the shutdown, maintenance should be done well. For example, before the shutdown, just before the woodworking project, during the shutdown, ventilation should be maintained under the condition of ensuring safety, so that the painted site can emit the smell of wood and paint as much as possible.
Fourth, the self-acceptance of decoration quality
After all, it is your own house, and it will always be particularly "sharp-eyed". During the shutdown, if you have time, you can use this time to carefully check whether there are problems in the completed construction projects. For example, the tiles that have been laid before the shutdown should be checked with a small hammer to see if there is a large area of empty drum. If problems are found, you can mark them first so that they can be repaired as soon as possible after returning to work.