Changchun Nanling Stadium was originally named Changchun Stadium and Wuhuan Stadium. Because it is located in Nanling area, Changchun people used to call it Nanling Stadium. Nanling Stadium, completed in 1990 and1July 1994, can accommodate 45,000 people. The project covers an area of 10.08 hectare with a total construction area of 43,000 square meters. The original site is the national new Beijing complex built by the Japanese during the Puppet Manchukuo period.
Changchun Economic Development Stadium was built in 2002, with a capacity of 3 1.200 people and a construction area of 32,200 square meters. It is a steel truss cable structure with tower columns. Because it is located in the suburbs, the traffic is inconvenient, so it is registered as a backup stadium.