Development Conception With the progress and commissioning of China's "Twelve National Hydropower Energy Bases" from 2000 to 2020, after 2020, the main battlefield of hydropower development in China will gradually shift to southeast Tibet, namely Jinsha River, Lancang River, upper reaches of Nujiang River and middle and lower reaches of Yarlung Zangbo River, and the strategic "power transmission from Tibet" project will be started. These are some more grand and arduous, technically complex and important hydropower construction tasks. Super-giant hydropower stations known as the "four kings" in the world, and three hydropower stations in the lower reaches of the Congo River. The world's first taxi, Yingjia Super Waterfall Hydropower Station. The water volume is as high as 4 1000m? /s, 2 1 times that of Medog. Unfortunately, the installed capacity and power generation of Medog Hydropower Station rank second in the world. However, the gap of 2400 meters is the first in the world among giant hydropower stations.
At present, the Medog Hydropower Station, which is still in the investigation stage, is located in the "big bend" canyon section 260 kilometers from Paicun (district) in Milin County to Xirang Village in Medog County in the lower reaches of the Yarlung Zangbo River in Tibet. The river has a drop of 2350m and an average annual discharge of 60 billion m? . The straight-line distance between the bend and the river is 35 kilometers, which can be used as a huge diversion tunnel. Six large hydropower stations with 6.5438+million kilowatts are arranged along the Xirangqu River Basin, each with a drop of 400 meters. The total installed capacity is 60 million kilowatts. Become the second super hydropower station in the world. Cross the Himalayas to the downstream city of Medog to generate electricity.