Good news! Xu Jialing Bridge in Bazhong-Beiya section of G245 National Highway was completed and opened to traffic.

After nine months of intense construction, Xu Jialing Bridge, the G245 node project of National Highway, was recently completed and opened to traffic. The reporter saw at the scene that the signs on the wide bridge deck were standardized and the markings were neat. On both sides of the road, the master workers are carrying out the final cleaning work.

It is understood that the Bazhong-Beiya (Nanchong boundary) section of the national highway G245 is an important part of the 44th longitudinal line of the National Highway Network Planning (20 13-2030), and it is the third round of traffic conference in our city. 663 1? One of the key projects of comprehensive transportation system.

G245 line starts from the return air pavilion in Bacheng, passes through the return air bridge, Bazhong City Square, Yangjiaba, Xu Jialing, sanjiang town, Liang Yong Town, Yushan Town, Guangong Town and Chaba Town, and ends at Beiyakou (Nanchong boundary) in Lequn Town, enyang District. The total length of the line is 765,438+0.65,438+0.72 km, which is built according to the standard of secondary highway with a design speed of 60 km/h.

The Bazhong-Beiya (Nanchong boundary) section of National Highway 245, as an important part of G245 connecting Bazhong and Nanchong and passing through Sichuan and Chongqing to Jinping, Yunnan, is a fast-track exit from Sichuan, which will promote economic development along the route, accelerate integration into the Northeast Sichuan Economic Zone and Chengdu-Chongqing Double Economic Circle, and promote the coordinated development of enyang and Yilong, Bazhong and Nanchong regions.