When there is a problem with the decoration, don't rush to rework it first. First of all, you must determine the necessity of rework: does the construction of this link affect the quality of decoration? Does the construction not conform to the original design really affect the decorative effect? How much money and time does it take to rework the decoration? Only by determining the necessity of rework before rework can we avoid repeated rework, which is time-consuming, laborious and costly.
Step 2 rework as soon as possible
After determining the necessity of rework, we should immediately stop work and start rework. The longer the delay, the greater the time loss and economic loss. But what needs to be reminded here is that in order to ensure the construction period, the reworked workers and building materials should be arranged in place quickly, which requires the cooperation of the construction party and the owner and must be handled well.
3. Clear responsibilities
Before rework, it is necessary to clarify the payer of the materials and labor costs required for rework, that is, to clarify the responsibility for rework. Under normal circumstances, the cost of rework caused by the owner's design change shall be paid by the owner; The cost of rework caused by construction quality problems must be paid by the constructor. Therefore, when you sign renovation contract, you should also clearly define the responsibilities in rework to avoid disputes in the future. For the acceptance of the reworked project, it is only necessary to carry out the acceptance according to the standards agreed in the contract, but pay special attention to whether the periphery of the reworked project is intact.