Green plants can be placed in the villa, such as rich trees, rich bamboos, etc. The green evergreen plants with big leaves symbolize vitality and are beneficial to the room.
It is right to have a fish tank in the villa, and goldfish can be kept. Goldfish is called feng shui fish, which can make up for some defects of villa home feng shui. However, it should be noted that sundries cannot be piled up next to the fish tank, nor can they face the kitchen. The kitchen is in harmony with fire and water, and the goldfish's fortune is useless.
Bagua mirrors and wind chimes should not be placed in the home decorated with villas. These things are congenitally deficient in pattern. If necessary, please ask a professional for guidance before placing.
If the light in the living room of the villa decoration is insufficient, you can add pictures and lights to make up for it. Painting should draw auspicious patterns or landscape paintings, and peony painting can also symbolize wealth and splendor.
If the bedroom of the villa is too small, the mirror of the room and the mirror of the dressing table should not be too big.
No matter whether your villa is often inhabited or not, the doors and windows in the room should be opened and closed frequently, so as to be fresh and natural.
How to check and accept the renovation of new houses? Acceptance is a very important process for us. Details are as follows:
Doors and windows must be installed firmly, horizontally and vertically, with the same height. Doors and windows should be opened flexibly, without blockage and rebound. Complete hardware accessories. The installation position of the door lock is correct, and the switch is flexible and effective. After the doors and windows are installed, the surface should be clean, and the bedding face should be free of scratches and bumps. The paint film should be smooth, uniform in thickness and free of air holes. Curtain boxes, heating covers, wooden parapets, wooden partitions, door and window covers, skirting boards, decorative lines, etc. of fine woodwork. Must be nailed to the grass-roots level and must not be loose. The gasket and panel must be firmly bonded, and layering or bulging is not allowed. Paint should be smooth, flat and uniform in color.
The hot and cold water switches, faucets and showers in the bathroom are all installed straight, which is flexible and convenient to use. You can switch it on and off several times during acceptance to see if the water flow changes with the opening of the wind gate. The drainage pipe should be unblocked without slope, blockage and leakage, and the floor drain grate should be slightly lower than the ground. During acceptance, water should be filled repeatedly, and then drained to see if the drainage is smooth.
Wall and floor tile paving should be smooth and firm, with uniform joints, and local hollowing should not exceed 5% of the total. Around the waterproof layer of the kitchen and bathroom, the contact with the wall should be turned up, not less than 250 mm from the ground. The running water on the ground surface inclines to the floor drain, and there is no flooding or water accumulation, and there is no leakage in the 24-hour water storage test.
Wall coating engineering requires putty to be firmly combined with matrix without peeling, pulverization and cracking. No peeling, brush leakage or undercoating is allowed for latex paint, and there is no sagging or wrinkle on the surface. The surface color is consistent and there is no obvious brush mark.
When wooden decorative lines such as hanging mirror lines and top corner lines are butted, 45-degree rubber slope joints should be adopted, and there can be no staggered joints or split joints. It is required to be straight, even and close to the wall, with correct convergence. The ceiling keel shall not be distorted, and the installed keel shall be firm and reliable. Plasterboard cover is closely connected with keel, and should be fixed on keel with galvanized screws, and nail head should be coated with antirust paint.
After the completion of electrical engineering construction, necessary inspections and tests should be carried out, such as lighting of lamps, control of switches, and repeated switching several times. Check whether the line meets the requirements of "live wire switch, neutral lamp holder" and the socket should meet the requirements of "left zero and right fire, upper grounding". Switch socket panel should be installed firmly, with correct position, flat cover, smooth surface, close to the wall and no gaps around. The switch or socket height in the same room should be consistent. After the completion of the project, ask the construction unit for the wiring completion drawing, indicating the wire specifications and the direction of the concealed pipe.
The above is some knowledge of geomantic omen and decoration acceptance, I hope I can help you.