The building area is 43,000.00 m2, with 20 floors, and the total number of households is 466 1. The floor area ratio of this building is not high, only 2.90, but the greening rate is relatively high, reaching 30.00%, which is very livable.
Convenient transportation, multi-dimensional land, sea and air transportation network;
high-speed railway
It's about 20 kilometers to high-speed railway station, from Qinzhou East Station? About 30 minutes? It takes about 3-4 hours to reach the Beibu Gulf urban agglomeration such as Nanning, Beihai and Fangchenggang, and the Pearl River Delta cities such as Guangzhou, and it takes about 5-6 hours to reach Guiyang, Chengdu, Chongqing and Hong Kong.
airport
Airport flights fly directly to provinces and Southeast Asian countries; It takes about 1 hour to reach Wuxu Airport, and it will take about 40 minutes to reach Sihe Airport in the future.
winged
The project is only 4 kilometers away from the nearest expressway, Blue Ocean Expressway, and it can be reached in 5 minutes by car. Six cities in Guangxi Beibu Gulf Economic Zone can be reached quickly through the Blue Ocean Expressway, and all the core cities in Guangdong-Hong Kong-Macao Greater Bay Area can be reached in five hours.
Adjacent to the main road
The project is located beside Beibu Gulf Avenue and Anzhou Avenue, in the center of Shajing Island in Maoweihai, only about 1 km away from these two main roads, and15km away from the main road leading to the city center, so the traffic is very convenient.