Foundation laying for Shimaowan project 1 with an estimated investment of 3 billion yuan. Yantai City leaders Zhang Jiangting, Liu Shuqi, Liu Yanlin, Sun Chengxian and Chairman Xu Rongmao of Shimao Group attended the ceremony and laid the foundation stone for Shimao Project. At this time, the construction work is in full swing.
June 5438, 2008+10 month
The foundation part was completed, which lasted 13 months, and was dug to 79 meters underground. There are 500 piles in the main building and anti-floating piles in the podium 1200. Ensure the stability and reliability of this key project in Shandong.
At the end of 2009,
Two sea-view apartment buildings, R3 building (196m) and R2 building (185m), were capped. It is the tallest building in Yantai (completed)
20 10 ends
T 1 super high-rise complex tower (323m) has been built to the ground 13 floor. It is expected to be capped at the end of 20 12. Among them, the lower floor is designed as an office building, the middle floor is a super five-star Hilton Hotel, and the upper floor is a hardcover hotel-style apartment.
Sea view R 1 apartment main body capped (180m).
20 10 12 18
Shimao Department Store opened with a total area of 4 1 1,000 square meters. The basement is mainly composed of 4D cinema and home furnishings. The first floor is dominated by jewelry, jewelry and international famous products; The second floor is dominated by women's jewelry and fashion celebrities; The third floor is dominated by men's ornaments and theme sports gentlemen; The fourth floor is dominated by leisure food. At present, more than 70 well-known brands at home and abroad, such as Yan Ni, Giovanni, Baja, China Gold, Korean Lok Kou and American Subway Restaurant, have been introduced.
At the beginning of 20 12, shimao T 1 comprehensive tower was 277.9 meters (323 meters with a 45-meter steel mast top), and about 140 meters had been built, with a construction area of about 96,000 square meters. It is expected to be capped at the beginning of 20 13.