The first thing to consider in plant decoration is the ground part. Generally, the floor for plant decoration does not need to bear the load, so we can consider using some inexpensive decorative materials, such as floor tiles or composite wood floors. Some factories should consider anti-static when decorating, so we should choose anti-static floor or anti-epoxy floor as the first choice for plant decoration, and some factories need the floor to bear the load when decorating. Then concrete will be made on the ground base. Concrete can be divided into two types: commercial concrete and soil concrete. The former is slightly higher in cost but stable in quality, while the latter is lower in price and average in quality. Then other hard stones can be laid on the concrete base as decorative materials.
2. Reasonable top surface design
In addition, pay attention to the top when decorating the factory building. The top of the factory building is generally relatively high, and most of them are steel frames. When decorating the top floor, first of all, we should design reasonable arrangements for fire fighting, ventilation and central air conditioning, because these are all necessary hardware facilities in plant decoration, especially fire fighting. The next step is to determine whether there is a ceiling according to the requirements of use. There are many materials in the ceiling of the factory building. If you want to be beautiful, you can decorate the top with mineral wool sound-absorbing board, gypsum board, aluminum-plastic board and other materials. You can also decorate some facilities that need to be hidden or unsightly at the top without any suspended ceiling, which is also a modern minimalist design.
3. Effective space segmentation
The division of the internal space of the factory is mainly for the operators to make rational use of the space according to their actual use needs. If there are many equipments in the factory, it is not advisable to set too many partitions and partitions. Try to use the color of the ground or some colored signs to divide the area. When dividing areas with signs, we should avoid too many color systems, which will not only make the division of areas not obvious, but also make people feel dizzy. Some factories can clearly divide the equipment area and the office area. This kind of planning is more common because it is easy to manage. Then when designing such a factory building, it is necessary to master the close combination of data and various spaces, and also consider the smooth working distance between the equipment area and the office area and the interference of dust and noise.
4. Reasonable layout of use functions
Scientific division according to specific actual areas is the primary purpose. Generally, the workshop area is large, so the distribution of personnel and the reservation of ventilation and fire exits should be considered when dividing the use functions.
5, fire approval
For the sake of safety, we can't ignore the installation of fire fighting equipment. Before installing fire-fighting facilities, we need to go to the local fire station for approval, and after the project is completed, we need to report it for approval. Generally, it takes about 10 days to complete the fire control examination and approval procedures, so it is necessary to consult the fire control company on this project before decoration.
6, the choice of partition
In the process of decoration, some areas should be reasonably divided into different functional areas, so it is necessary to divide them with partitions of different materials. At present, the commonly used partitions are: light steel keel gypsum board partition, stainless steel glass partition, aluminum-plastic plate tempered glass partition and pure tempered glass partition. These partitions can play the role of division, but the styles they represent are different and the prices are different. Among them, the light steel keel gypsum board partition wall has low cost and is often easily accepted.
7, the choice of ground materials
The floor of the workshop is very important because there is a lot of wear and tear every day. Try to choose some durable materials. If the ground bearing workshop is needed, it is best to lay a layer of concrete on the original ground. For some workshops that need anti-static, anti-static floor or anti-static pvc should be laid on the ground. There is also a more wear-resistant floor material called "terrazzo floor", which is more economical and practical. However, with the emergence of new floor materials in the workshop, this product has been less concerned.
8, the choice of top materials
Mineral wool sound absorbing board and calcium silicate board are commonly used materials in plant decoration. These materials are low in price, low in ignition point and simple in operation, and are usually recognized by consumers. It should be noted that no matter what kind of material is used as the top material, it needs to be mainly coordinated with fire protection facilities. Usually, the ceiling keel is made first, and then the pipeline facilities for spraying and smoke sensing are installed in the fire fighting project. After all the ceiling materials are capped, the fire control facilities will finally spray the adjacent heads and smoke detectors.