1. Application for construction projects within the scope of river management (in triplicate).
2. Documents on which the construction project is based; .
3. River courses and flood control schemes involved in the construction project.
4, the construction project occupies the beach within the scope of river management and the flood control standards and measures of construction projects.
5, the influence of the construction project on the river regime change, dike safety, river flood, river water quality and the measures to be taken.
6, for important construction projects, the construction unit should also prepare a flood impact assessment report; (Issuer: enterprise, institution or individual).
Extended data:
Relevant provisions of People's Republic of China (PRC) and the national water law.
Chapter V Flood Control and Flood Fighting
Article 38. People's governments at all levels should strengthen leadership and take measures to do a good job in flood control and flood fighting. All units and individuals have the obligation to participate in flood control and flood fighting.
Article 39 The flood control headquarters of the people's governments at or above the county level shall exercise unified command over flood control and flood fighting.
In case of flood control emergency, the flood control headquarters has the right to transfer the needed materials, equipment and personnel within its jurisdiction, and shall return them in time or give appropriate compensation afterwards.
Article 40 People's governments at or above the county level shall formulate flood control plans and determine flood control standards and measures in accordance with the principles of river basin planning, ensuring key points and giving consideration to generality.
Flood prevention schemes for major rivers in China are compiled by the Central Flood Control Headquarters and submitted to the State Council for approval.
After the flood prevention plan is approved or formulated, the relevant local people's governments must implement it.
Article 41. In flood control rivers, flood storage and detention areas and flood storage areas, land use and various constructions must meet the requirements of flood control.
Article 42 According to the natural flow potential, the design standard of flood control and drainage engineering or the approved operation plan, no obstacles shall be set up in the downstream area to block water or reduce the water capacity of the river; The upstream area shall not increase the flow without authorization.