The dispute of Guangming Expressway

The planned blessing section of Zhongcun Village in Panyu adopts a sunken tunnel, which is about 1.8km long. At present, due to the obstruction of the Clifford Group, the construction is stopped because the supporting electrical room of the tunnel affects Clifford Feng Shui. If it cannot be opened to traffic as scheduled, the daily travel of 200,000 villagers in Qifu New Village will be troubled for a long time.

The planned west extension line of Guangming Expressway passes through the back of Wanwu Village, Genghe Town, Gaoming District, and its roadside pile is only 10 meter away from the nearest house. On May 3rd, 20 10, local villagers complained that the construction distance was too close, which would lead to cracks in the wall of the house. After completion, it will also be affected by noise, dust and other pollution. The distance between the expressway and the residential building is generally controlled at 30 meters. Subsequently, the person in charge of the west extension line of Guangming Expressway said that the line has not been finalized and is still being adjusted, and the project will fully consider the requirements of the local people.