Do a good job in protecting the construction site.
Before the shutdown and workers leave the construction site, the protection of finished products and semi-finished products should be done well. The owner should confirm the preservation method and temperature of various materials with the home improvement company, such as how to preserve various plates, stones and other accessories, and whether wood products need special protection. If possible, during the shutdown period, the owner had better go to the construction site several times to ventilate the construction site, which is beneficial to the indoor air quality after completion.
The owners find their own problems.
During the shutdown period, the owner had better not be idle, and can use this time to carefully check whether there are problems in the completed construction links. If the wall paint process has been completed before the shutdown, the owner can first observe whether there are cracks and obvious brush lines in the wall paint. If the wall brick has been paved, the owner can tap each part of the wall brick one by one with a small hammer to see if there is any empty drum phenomenon. When problems are found, they can be marked first, and workers can be asked to solve them first after returning to work.
Do a good job of safety
During the renovation period, there will be a lot of combustible substances in the room, such as wood and packing boxes, so the fire prevention work has always been concerned, especially during the unmanned construction period of nearly one month.
On the day of project shutdown, the owner must ensure that all power supplies are cut off, and the unused packing boxes and sawdust are cleaned up and transported out of the house. At the same time, flammable materials such as wood should be kept away from the power supply as far as possible, and a certain humidity should be maintained indoors. Nevertheless, every time you open the window for ventilation, you should take pains to check every corner and put an end to all unsafe factors.