2. Wall decoration: Try not to decorate the wall of your home with wooden boards in a large area. You can smooth the original wall and paint it with water-based paint. You can also choose a new generation of pollution-free PVC wallpaper, and even use natural fabrics, such as cotton, hemp, silk and so on.
3. Floor material: Floor tiles should be made of tested plates without radioactive elements. Before choosing composite floor or chemical fiber carpet, you should carefully check the corresponding product description. At present, there are many kinds of wood floors. As far as itself is concerned, solid wood flooring does not contain harmful substances, while inferior composite flooring may contain harmful substances. Therefore, when buying a floor, it is recommended to buy a painted floor as much as possible.
4. Top material: If the living room is not high, there is no need to make a ceiling. Brush water-based paint or paste environmental protection wallpaper after the original ceiling is leveled. If the ceiling is partially or completely suspended, it is best to use light steel keel gypsum board, calcium silicate board, Ette board and other materials instead of wood keel plywood.
5. Wires: Wires have live wires, ground wires and zero wires, with copper wires as the main conductor. Generally, you should pay attention to its heat resistance, insulation and so on when purchasing wires. But it depends not only on the above two properties, but also on the moisture-proof performance.
What is the process of house decoration?
1, design scheme: before decorating a house, the first thing to do is to determine the decoration design scheme of the house, mainly planning the internal structure and general spatial layout of the house, and then looking for a designer to design the scheme.
2. Hydropower transformation: Hydropower transformation is a concealed project in decoration. When decorating, we should do hydropower transformation according to the location of electrical appliances in the decoration scheme and the place where water is needed. In the process of hydropower transformation, we should strictly supervise the quality of hydropower projects and some related hidden dangers, and find and solve problems as soon as possible.
3. Construction links: There are many public links in the decoration, but they are generally in the order of installing mud painters.
4. Installation project: install air conditioning, fresh air and heating. Air conditioning and fresh air can generally be constructed at the same time as water and electricity. If fresh air and central air conditioning are installed simultaneously. It also includes cabinet installation, wardrobe installation, bookcase and shoe cabinet installation, door installation, floor installation, bathroom shower basin installation, shower room installation, finished bathtub installation, integrated ceiling air heating installation, switch socket lamp installation, etc.
5. Land reclamation and cleaning, and soft clothes enter the site: soft clothes also take a long period. Generally, curtains 15-20 days, beds, sofas and dining tables take 25-35 days (at least 3-6 months for import, 9- 12 months for high-end brands), and electrical appliances are basically ready-made.
6. Formaldehyde cleaning: Wait for formaldehyde to volatilize and the whole house will be repaired.