First, the preparation work before installing the ceiling
Water pipes, gas pipes and other pipelines should be handled well, and check for water leakage and leakage. When the gas water heater is installed, the hose of the range hood can be fixed with the flue without installing the range hood first. Determine the position of the range hood so as to open the hole when installing the integrated ceiling. Prepare to buy electric products that need to be punched, such as spotlights and yuba, and generally install integrated ceiling for free punching service. The customer is responsible for the wooden frame needed by the traditional Yuba. If the ceiling company needs to install Yuba and wooden frame, it needs to pay extra. During installation, the landlord should ensure that there is an electrified power supply and a ladder or woodworking table frame to facilitate punching and climbing operations.
Second, the order of kitchen and bathroom facilities
Generally speaking, it is no problem to install the bathroom cabinet toilet in the shower room on the integrated ceiling. Many owners have different ideas about whether to install the kitchen cabinet on the ceiling or to make the cabinet frame first. Both are feasible, but we should pay attention to the framework first. The carpenter must order a horizontal board above the frame to nail the corner line. The top edge of the cabinet door panel is 2 cm lower than the top edge of the wall tile.
1) When the kitchen is sanitary and indirect balcony, there will be a beam in the middle, so it is not easy to knock off the cement pouring. The horizontal height of the ceiling must be lower than the beam.
2) The balcony is closed and the windows are relatively high. At this time, you can deal with the corner line by ordering a horizontal board or fixing the walls on both sides of the corner line, hooking the middle with aluminum sheets and pulling them to the top for fixing.
3) Windows on the wall, which we often encounter when installing, some tiles are all pasted, and the upper edge of the tiles is just 4-5 cm above the window, so the bricklayer will not mend the tiles. When installing the ceiling, we nail the corner line along the upper edge of the tile and then hang it for 2 cm, which will have a gap with the window. If we make a ceiling height line along the upper edge of the window, we should punch holes in the upper edge of the tile, which is often empty and easy to crack. Another is that the window is more than 2 cm above the upper edge of the tile, and there will be gaps between the ceiling and the outside of the window. When opening the window, it is easy for wind to blow in and make abnormal noises. When installing the ceiling, you should also make a horizontal plate.
4) Water heaters, especially old houses, are not high, so water heaters cannot be installed below the ceiling, and the supporting energy is half above and half below the ceiling. When installing the ceiling, the water heater should be installed first, and the horizontal installation should not be vertical.
Three. Precautions for installing ceiling
I plan to install an integrated ceiling at home, so when I do water and electricity, I should consider the issues of setting out and ceiling height line. In addition to setting switch sockets in the bathroom, Yuba also reserved six control lines, namely 1 neutral line, 1 lighting and ventilation control line and 1 neutral line. The current Yuba is multifunctional, and the six-line can meet the requirements of most Yuba in the market. Until the ceiling installation, the control line is worn less, which is more troublesome. Leave 3 control lines for kitchen lighting lines; When the kitchen is long, you can put a wire at each end to install a lamp, and three wires can meet the need of installing another ventilator or electric fan (cool bully). The new house is reserved about 35CM from the bathroom ceiling to the wall brick, and about 25CM from the kitchen, which can be set according to the clear height of the house. The upper edge of the wall brick should not be higher than the top sewer pipe, and the height line of the ceiling is generally about 2 cm below the place where the wall brick is attached, so that the steel row nails can be nailed to the cement wall from the upper edge, which is more beautiful to cover the upper edge, without gaps, and there is no need to punch holes in the tile. The newly placed water pipe or conduit shall not be lower than the upper edge of the wall brick.