House information: 89_
Decoration style: simple and idyllic
Decoration method: half package
Residential area: Luo Jin Xinyuan.
Construction progress: hydropower transformation
Duration: 10 days
20 13 September 0 1 Learn wiring knowledge.
Today, hydropower started, and Zhang Gong explained it to us responsibly. Praise it ~ start digging ditches ~ ~ ~
I learned a little about wiring. At present, wires are divided into 1.5, 2.5, 4 and 8. High-power electric water heaters need 8 wires, high-power air conditioners need 4 wires, generally 2.5, and lighting only needs 1.5.
I looked at the budget materials, 1.5 and 2.5. I consulted my colleagues. Zhang Gong, a decoration company, was immediately contacted with the 4.0 line for air conditioning in her living room, and was told that less than 3 batches of air conditioning for line 2.5 would be enough. However, considering that high-power air conditioners may be used in the future, to be on the safe side, Zhang Gong has changed to line 4.0, and the others are still 2.5 and 1. There may be no need to worry, but if you can consider some small details, try to think about it, and it will be convenient to live by yourself in the future.
Matters needing attention in wire purchase:
1, conductor length 100 m, plus or minus 0.5 m.. Some merchants also provide zero-cut wires to meet the needs of some users to buy wires in small quantities.
2. Common specifications are 1 square/1.5 square /2.5 square /4 square /6 square/10 square, etc.
3. Sockets generally use single-core bv2.5 square wires.
4.3 air conditioners. Single core wire bv 1.5 square wire for lighting lamps, two volumes of different colors (neutral wire and live wire).
6. Single-core bv6 square wire is used for household bus.
7. The fire line is generally yellow-green-red, the zero line is blue, and the ground line can be yellow-green.
8. Two-core and three-core sheath line, as open wires, are mostly used for site construction, not for home decoration. Three-core sheath line 2.5 square meters can be used for cabinet air conditioning.
20 13 09 03 Zhang Gong is in charge.
When tearing down the old ones, Zhang Gong found that our gas pipeline was still a hard pipe, so he suggested that it was safer to replace it with a hose, which was both flexible and space-saving. Praise Dong Gong for his sense of responsibility and professionalism.
After contacting the gas company, they went to the house for measurement the day after tomorrow, and then installed it. Now we are waiting for the design drawings given to us by Zhibang engineers.
20 13 09 04 was fooled.
Today, I continued to slot, not bad, horizontal and vertical. It is said that I went to Zhibang today and was fooled. Going home with my husband, the money is wrong. Actually, I can save more. I went to the counter and calculated that it was 0.3 meters more.
One more thing, if you make a pentagonal cabinet, it is 0.56 meters more than a right-angle cabinet, and it costs 2000 yuan. . Then don't, after all, pursue cost performance! At present, the counter is 2.05 meters, and Zhibang calculated 2.35 for me. The lower cabinet is 3.54 meters, and it is estimated to be 4. 1 meter to make a pentagonal cabinet. This saves 0.3 to go to the counter and 0.56 to go to the counter, which is very economical!
20 13 09 05 I lost my ID card.
At home, water and electricity began to slot and wire, and the electrician was very young and professional. I praised a designer of Zhibang, and he also went home for a second interview today. I always think that young man is in a hurry. Haha ~ I was shocked to lose my ID card, so I quickly contacted Dong Gong to see if there was any at the scene. As a result, I received a text message half a minute later and was told that someone had found it in the subway.
The bathroom door of my house is facing the gate, and the feng shui seems a little bad. I thought about getting a partition porch. When I chose it, I felt more atmospheric, but I was afraid it would be difficult to take care of it.
The cable arrangement is smooth.
Yesterday, the gas company came to measure and change the hose, and paid the construction fee, 1000 meter to change the hose. It was installed this morning, and the efficiency is still good.
I went to the exhibition during the day and went to the construction site before I came back at night. It walks very fast. We discussed with Zhang Gong that 4.0 is used for air conditioning and kitchen, and 2.5 is used for others. Zhang Gong made it very clear to the electrician that all the conduits in the house are really 2.5 Panda wires, OK!
20 13-09-08 gas pipeline leaks!
Sequela of gas company replacing hose: gas pipe leaks! Immediately after receiving the call from Zhang Gong, I reported the repair. When I got home, I found that the air leakage had filled the whole room! The repairman found that the rotary pipe was burst and could not be repaired for the time being, so he closed the main air valve on the first to sixth floors of our row.
We have to explain from the first floor to the sixth floor, which has caused a lot of trouble for everyone. After all, the gas boiler is used at home, so it is estimated that bathing is not acceptable. The family on the sixth floor just came home from a trip on Sunday, covered in sweat. I'm really sorry! What a worry! There are such wonderful activities! I hope it will be repaired soon tomorrow morning, so as not to affect the neighbors.
Anything can happen in the decoration. Experience is to accumulate experience, such as the gas leakage after the gas company changed the pipe, but there are also dark clouds behind it, because the position of the gas meter is eccentric, so it is easier to read the meter ~
20 13 September 10 completed the work beautifully.
Wei Xing PVC hot water pipes are used for water pipes, which are hot left and cold right. Avoid hot water pipes near gas pipes to ensure safety. The balcony is being bored, because it is too high, the master needs to frame the pipe from the outside to the second floor to make holes. It was a complicated job, but they did it beautifully.
Air conditioning water moves from indoor to outdoor, and the space of shower room increases. Very good, well done.
2013 September 10 was successfully accepted.
Apply for water and electricity acceptance. The supervisor was busy, but considering my limited time schedule, I made an appointment to arrive on time at two o'clock in the afternoon and raised many questions.
Due to my limited professional knowledge, the inspection terms in the hands of the supervisor are very clear and focused when the water and electricity are accepted. Let me check the terms and conditions, and I did find some minor problems.
Decoration experience:
Dear owners, under the friendly reminder, you must do your best to decorate yourself! Don't rely too much on and trust others. What you see or learn on the Internet are all very important clues, which also makes me decide that if I have time in the future, I would rather read my host's diary and learn more, rather than yelling that there is nothing.
There are three problems in hydropower acceptance:
1) The electric pipe in the bathroom goes to the ground.
2) The owner was not informed of the on-site inspection of water pipe pressure test, and there was no video or photo record. .
3) There is no obvious isolation between strong and weak currents.
Fortunately, these problems were settled amicably after negotiations with Zhang Gong.