Architecture Graduation Project Proposal

Architecture Graduation Project Proposal Report Template

The Architecture Graduation Project Proposal Report Template is as follows. I hope it will be useful to everyone.

1. The significance of the topic and the purpose of the research

(1) In order to meet the requirements of the times and society, we have proposed more solutions for modern residential communities in the 21st century. High requirements must be that it is not only the main body and image of the city, but also a landmark building in the region. It has dual functions of urban economy and society. Therefore, it also poses higher and more challenging questions to contemporary college students, so that through the architectural image, Modern materials and technologies integrate the building into an organic whole, expressing a new architectural aesthetic concept.

(2) In recent years, frame structures have developed greatly around the world. Various types of frame buildings including shopping malls, residences, hotels, office buildings and multi-functional buildings have been built in many cities. It has become one of the realities that civil engineering students must face after graduation to participate in or engage in frame structure design.

(3) Through the graduation project, we make a systematic application of the knowledge we learned during college. We visit and compare similar buildings, consult and collect relevant design information on the basis of familiarity with the mission statement. The knowledge learned can be comprehensively applied, improve the application ability of knowledge, and cultivate independent solutions to architectural design, structure the content and steps of design, and master the methods of drawing construction drawings to lay a good foundation for future work.

2. Current Design Status

(1) With the development of economy and the acceleration of urbanization, a large number of people continue to flock to cities, resulting in the continuous expansion of urban scale and limited Resources are constantly decreasing. As a large energy consumer, buildings need to be more energy-saving and material-saving in planning and designing current buildings to save energy to the maximum extent.

(2) The modern residential community built to meet and improve the overall planning requirements is not only the main body and image of the city, but also a landmark building in the region. Therefore, during the design process, it must meet the surrounding regional environment and Based on the urban design concept, modern architectural style design techniques are used, combined with modern materials and technologies, to integrate architecture into the entire planning

(3) With the development of society to this day, material enjoyment is no longer the mainstream. However, spiritual enjoyment has gradually become more prominent, so this also puts forward higher requirements for the design functions and auxiliary facilities of modern buildings to ensure that the facilities are complete, convenient to use, and the functions are reasonable and smooth. In addition, Feng Shui plays an important role in modern architecture. In addition, the application of rinsing is very thorough, so we are required to consider it very comprehensively during the design process.

3. Project design content and requirements

(1) Basic tasks and requirements

The basic tasks of this design include architectural design and structural design; the specific requirements are as follows :

1. Architectural design requirements: Draw the general plan, ground floor plan, floor plan, main sections (the basic methods of roof, floor, ground, etc. should be noted in the drawing), main elevations, drawing catalog, The design description, door and window tables, and the feasibility of the structural plan need to be comprehensively considered; the construction drawings must be drawn strictly in accordance with the "Architectural Drawing Standard (GB/T50104-20010)". The specific requirements can be found in the detailed description of the mission statement.

2. Structural design requirements: Reasonably determine the structural layout of the structural plan; based on the structural layout, conduct internal force analysis and reinforcement calculations for the designated frames, beams, slabs, stairs, and foundations. For example, in the load-bearing part of the wall, the load-bearing capacity and stability of the wall should be checked, and detailed design calculation steps must be carried out. The structural construction drawings should be drawn according to the hand-calculated design calculation results.

(2) Eagle King? Kangqiao Mingju Residence

1. Design information:

(1) Natural conditions: Basic wind pressure: 0.35KN/m2 , Seismic fortification intensity: below 6 degrees

(2) Structural design parameters:

Building structure safety level two

Building structure importance category C< /p>

The design service life of the structure is 50 years

Foundation safety grade A

(3) Design scale: 1# building area is 2522.93 square meters, including residential buildings The area is 1934.96 square meters, the commercial area/storage area is 360.72/57.03 square meters respectively, and the garage/property management area is 170.22 square meters

(4) Proposed location: The construction site of this project is located in Yingtan City South Station Logistics Group, on the north side of the sports center, the project site is adjacent to the city road in the east, No. 51 Road, facing Jiaying Waterfront Washington; in the south, it faces No. 46 Road, facing the sports center; in the west, there are urban planning roads; in the north Connected to Wanfu Residential Community

2. Functional requirements

In the design plan, the commercial part, residential part, greening part and supporting facilities in the community are combined and integrated from top to bottom. , organized and arranged according to the functional requirements of the community to meet the building use requirements to the greatest extent. Commercial and residential buildings are set up along No. 51 Road and No. 46 Road. In addition to meeting the internal commercial needs of the community, it also integrates into the entire city’s business circle. In this building There are two main types of units, A3a and A6, which adopt a floor plan and add an auxiliary space on the roof terrace in the design, providing residents with favorable conditions for utilizing solar energy

(3) Structural form

1. The maximum height of the upper structure is 18.890 meters, with 6 floors above the ground. The structural system is a reinforced concrete frame structure. All buildings and roofs are reinforced concrete beam-slab floors.

2. The foundation form will be determined after the site address survey

3. Infill walls and partition walls should be made of porous brick walls or fly ash aerated concrete blocks. The foundation is made of C20 concrete and the frame is made of C30. The steel bars are made of grade I and II hot-rolled steel bars. The load is determined according to national specifications.

IV. Key points and difficulties in design

(1) In the construction drawing design stage, based on the design plan, it is necessary not only to consider the functional relationship between the neighbors of the room but also to The shape, proportion, and even the position of doors and windows should be carefully considered

(2) Any architectural design requires the coordination of other professional designs to make the construction drawing design a complete design, because in the plan In the design stage, architects often only focus on architectural design, and for structural professionals, they can only propose plans based on modeling. Therefore, how to coordinate the design conflicts between various majors has become a difficult point in construction drawing design

(2) As the country's requirements for building energy conservation continue to become stricter and more stringent, construction drawing designs often add a schematic diagram of the location of the building's thermal insulation layer (indicated by specific drawing lines and text descriptions in building plans and sections). The meticulousness of construction drawings is from a micro level, that is, the design of construction drawings should be accurate and consistent with other professional practices. The graphic expressions should be clear and clear, and the size of the drawings should be appropriately selected, so that they can not only be integrated with other professional designs, Good cooperation in carrying out design work, and more importantly, the construction drawings can be easily read by on-site construction personnel, improve construction efficiency, shorten the project construction cycle, and reduce project construction costs. It can also be regarded as an architect who has made a contribution to the country and the people. Responsibilities and obligations.

(3) Pay special attention to the drainage slope, roof waterproofing, and the setting of the parapet.

V. Schedule of design work

(1) Preparatory work May 10, 20xx ~ August 31, 20xx Topic selection, research and data collection, writing literature review and project proposal report

(2) Complete structure selection, structure layout, and structure calculation before November 30, 20xx

(3) December 31, 20xx ~ March 20xx On the 9th, prepare for the graduation defense, organize the graduation project results, and write a summary of the graduation project

(4) Graduation defense time from March 1, 2013 to March 10, 2013

< p>6. Dear teachers, under your guidance, I have made sufficient preparations for this graduation project by carefully reading the assignment letter and referring to various literatures. I solemnly request you to propose a topic. . ;