Turn left | turn right
Construction technology of imitation fair-faced concrete coating
Primer 1 pass, intermediate coat 1-2 times, topcoat 1 pass 1, surface treatment of base course: check the surface of base course and clean and repair it; Putty 2. Roll-coating primer: Roll-coat transparent primer directly on the surface of the base, once, 8-10m2/kg.
Turn left | turn right
3. Batch scraping and intermediate coating: After the primer is completely dried, open the package of fair-faced concrete coating, add about 40% water to make it paste, and scrape it at will with a batch knife, so that the wall surface presents natural mottles and lines and is not exposed to light. 4. Color modification can be performed according to the effect.
Turn left | turn right
5. Roll-coating topcoat: After intermediate coating 12 hours, roll-coating topcoat directly once, 8- 10㎡/kg Note: the cement surface or putty surface shall be free of oil stains, and the base surface shall be smooth, rough and not too smooth.