Fire maintenance contract: fire maintenance contract

Party A: * * * Co., Ltd. (seal)

Party B: * * * * * Engineering Company (seal)

In accordance with national and local regulations and technical specifications on building fire-fighting facilities, this fire-fighting facilities maintenance contract is hereby signed to ensure the normal operation of building fire-fighting facilities.

Article 1: Both parties to the contract

Party a: * * co., ltd

Party B: Engineering Company

Article 2: The contract mode is * * * * * * * * * * * * * * * * * * * * * * * * * * * *.

(The specific project name and the building fire control facilities that Party A has reported to the public security fire control institutions for acceptance or put into use)

□ Automatic fire alarm system

□ Automatic sprinkler system

□ Fire hydrant system

□ Spray cooling system

□ Foam fire extinguishing system

□ Gas fire extinguishing system

□ Fire separation system

□ Smoke control system

□ Emergency lighting and evacuation indication system

□ Fire communication equipment □ Mobile fire extinguishing system

□ Other fire control facilities

Note: Tick "√" instead of "×" in the box of the selected object.

Article 3: Contract Execution Objectives

According to the national and local technical specifications for building fire protection facilities, maintain the contract scope and ensure its normal operation.

Article 4: Responsibilities of both parties

Party A's responsibility: to provide all construction and installation completion drawings and legal qualification procedures of all fire control facilities recognized by public security fire control institutions within the scope of the contract; Bear the cost of maintenance and component replacement; Responsible for the daily operation and management of fire control facilities system; Notify Party B immediately when problems are found, and provide necessary working convenience for Party B to perform this contract; Pay the maintenance fee to Party B according to the amount and payment method stipulated in the contract.

Party B's responsibilities:

1. Repair and maintain the fire-fighting facilities provided by Party A within the scope of the contract according to the national and local regulations and technical specifications on building fire-fighting facilities to ensure their normal operation (except irresistible natural disasters and man-made destruction); In addition to regular maintenance of the fire-fighting facilities within the scope of the contract, send someone to repair them within 24 hours after receiving the failure notice of Party A's fire-fighting facilities; Regularly report to Party A and fire control institutions the operation of fire control facilities within the scope of the contract.

2. Party B shall collect the contract fee by calculating the maintenance labor cost. During the maintenance period, Party A shall bear all expenses for replacing worn and aging equipment parts (equipment parts can be purchased by itself or by Party B at the price agreed by both parties).

3. During the maintenance period, Party A needs to redecorate due to the change of operation mode, and the expenses arising from the renovation project of fire control facilities shall be borne by Party A in full (the price shall be agreed by both parties and Party B shall carry out the construction).

4. If Party B artificially damages Party A's equipment during the maintenance period, Party B shall compensate Party A at the original price.

5. In the sixth month of the warranty period, Party B shall carry out anti-rust treatment (touch-up paint) on the fire hydrant pipeline.

6. During the maintenance period, Party B shall provide Party A with the equipment operation test certificate.

* * * Same responsibilities: Abide by and implement national and local regulations and technical specifications on building fire control facilities; * * * Agree and implement the Code for Maintenance of Building Fire Protection Facilities; Regularly report the operation of the contractor to the public security fire control institutions and accept their supervision.

Article 5: Term of Contract Execution

The Contract shall be implemented from1October 20 1010/February 3 1 day.

Article 6: Contract Amount and Payment Method

Contract amount: the maintenance fee of this fire fighting system is RMB * ten thousand Yuan only (* 0000.00 Yuan).

Payment method: After both parties sign this contract, Party A shall pay Party B 30%(¥000.00) of this year's maintenance fee within the first week after signing this contract; Pay 50%(¥0000.00 Yuan) to Party B in the first week of the seventh month; Pay 20%(¥000.00) to Party B in the last seven days of the contract period.

□ Cash □ Transfer cheque □ Bank collection □ T/T

Article 7: Liability for breach of contract

Both parties shall not terminate the contract without reason. In case of breach of contract, the breaching party shall pay 50% of the unexecuted part of the contract to the other party.

If Party A fails to pay the maintenance fee within the time limit stipulated in the contract, it shall pay Party B a late fee of 3% of the total contract amount; If Party B fails to perform the maintenance duties stipulated in the contract, Party B shall pay 3% of the total contract price to Party A as liquidated damages.

Article 8: Others

This contract shall come into effect after being signed and sealed by the legal representatives of Party A and Party B or their clients;

This contract is made in duplicate, one for each party, with the same effect;

Matters not covered in this contract shall be settled by both parties through consultation.

Article 9: Signature of both parties

Party A: Party B:

Representative: representative:

Year, month, sun, moon, sun.