It will be available at the end of June!
Nantong West Railway Station is located in the southeast of Pingchao Town, surrounded by Wuhai Line, Katie Avenue, Tengtong Road and Yaosheng Road. It belongs to China Railway Shanghai Bureau Group Co., Ltd. and is an integrated transportation hub integrating railway, rail transit and public transportation. The West Railway Station has a total construction area of about 6.5438+0.6 million square meters, which is an underground station. From top to bottom, there are high-speed rail platform, high-speed railway station House, subway station hall and subway platform. The scale of the station is 4 sets of 8 lines, that is, 4 platforms and 8 railway lines, of which 4 are Hutong Railway and the two sides are Children's Eye High-speed Railway.
Project 20 19 started in April 18, and the platform foundation was completed in June 18. On June 10, the control node completed the hoisting construction of the last steel truss of the main structure, announcing the completion of the main structure, and completed the roof installation of the full-coverage canopy in March 2020. It only takes about 13 months from the official commencement to the static acceptance, mainly due to the innovative adoption of the "cumulative assembly slip" mode by the project department, which has won valuable time for the construction of the West Railway Station and the joint commissioning test of the Shanghai-Shanghai Railway to be completed as scheduled.
At present, the indoor and outdoor decoration of Nantong West Railway Station has been completed, and the final "makeup" is being carried out according to the acceptance feedback. The improvement of the decoration effect is even refined to the color of each wall pavement in the waiting hall, and there can be no color difference and consistency.
Nantong Su Yuan
As the largest and first high-speed railway station in Nantong, Nantong West Railway Station is designed with Nantong elements, reflecting the cultural characteristics of rivers and seas, and the streamline design for passengers entering and leaving the station is convenient and efficient.
In terms of decoration design, the roof of the station house is a glass roof with a full canopy, which is transparent to the atmosphere. The double-layer hollow aluminum plate with blue background and white surface at the entrance bucket creates the visual effect of blue printed cloth. At the same time, the ceiling design in the center of the station hall also incorporates blue calico elements, which is simple and fresh.
Convenient design
As a new station, it also runs through the design of more convenient railway operation. For example, at the ticket gate of the waiting hall, the self-service ticketing equipment is synchronized, and passengers do not need to hold tickets when waiting in the station. They can check the station first, then buy their own tickets and get on the bus now. This can avoid the crowds, tickets and passes waiting in line at the entrance of the waiting hall, and improve the waiting experience. The improvement of waiting experience is also reflected in the decoration details, such as the station bathroom, the introduction of home improvement concept, and the decoration of men's and women's bathrooms with blue and pink, which is warm and fashionable.