The railway slope is limited to below 2%, and the highway slope is 5%.
In this case, the railway approach bridge is longer than the highway approach bridge.
The solution is:
1, the railway is placed on the lower floor, and the railway approach bridge does not need to be built too long.
2. Put the expressway on the upper floor and bend the expressway approach bridge to solve the problem of different slopes.