How to prevent the water tower from being blown down by the wind when the typhoon comes?

The steps are as follows:

1. The free height above the attachment top line exceeds the design height in the manual, and two wire ropes for Rachel are set in the direction of the building.

2, jack-up tower crane is not attached, has reached the maximum independent height of the design specification, set up four cable ties.