Is it true that the terrace on the second floor is higher than the interior to see Feng Shui?

It is a feudal superstition that the terrace on the second floor is higher than the indoor view of Feng Shui. Tell you from a scientific point of view: if the water in the terrace may flow backwards into the room and soak the floor or furniture, you will have to spend money to buy a new one; There is water on the floor. If you are not careful, you will slip and fall.

Home decoration is to "materialize" all kinds of life situations into the room. The design of the bought general room has been completed, so it can't be adjusted greatly, so what remains to be moved is decoration (the big decoration concept includes room design, decoration, furniture arrangement and interesting small decoration).

Because life is my own, I must personally participate in the decoration process, not only during the decoration design and construction, but also after living in it. It is a huge and trivial project. Whether it is the customization of floors and furniture or the purchase of a few screws, the owner needs wisdom to integrate the starting procedures and the coordination of water, electricity, carpentry and other types of work.

preparatory work

renovation payment includes four parts: advance payment for construction, mid-term progress payment, late progress payment and final payment for completion. The proportion and time of payment should be indicated in the contract.

the advance payment for construction should be delivered before the plumber enters the site, and used for basic materials (such as blockboards, cement, sand, wires, battens and other materials) and part of labor costs, with 3% as appropriate.

the interim progress payment is basically completed at the grass-roots level. After the acceptance, it will be paid before the bricklayer enters the site. The specific payment ratio can be determined according to the progress and quality of the project, and generally 35% of the project payment is appropriate.

the late progress payment shall be delivered before the painter enters the site, accounting for about 3% of the project payment. If any problems are found during the period, the decoration company shall be required to make timely rectification as soon as possible.

the final 5% of the final payment can be paid after all the projects such as the final payment are completed, and the site is cleaned up after the completion acceptance is qualified. If the acceptance is unqualified, the payment can be made after the rectification is qualified.

if the whole project exceeds the construction period, the decoration company shall bear the liability for breach of contract for delayed completion. If both parties disagree with this, they can ask the relevant supervision departments to coordinate until both parties are satisfied and settle the balance. It will enter the warranty period.