What should be paid attention to in hydropower acceptance?

In the process of decoration, the quality of concealed works is very important. After the completion of concealed works, strict acceptance work should be carried out. Among them, hydropower acceptance is a very important project. Especially for owners who decorate old houses, hydropower transformation is very important. If the hydropower transformation is not done well, it will have a great influence on your subsequent use. There are quality problems in the concealed works and it is very difficult to maintain them. But what should be done to avoid the problems after moving in?

1. lamps with corrosion and other adverse conditions must be dealt with quickly?

Corroded or broken water pipes must be treated in time, and it will be very troublesome to maintain them if there is a problem. When accepting hydropower projects, we must strictly check the quality of water pipes, and the inner and outer walls of water pipes should be smooth and flat, and there should be no bubbles, cracks, depressions, peeling and cold spots! Excellent quality, such as: poly-antibacterial HI-PPR water pipe A, and the inner layer of the water pipe contains silver ion antibacterial masterbatch, which inhibits the activity of bacterial cell enzymes and the reproduction and regeneration of bacteria. B, the middle layer is grayish yellow PPR, which has strong shading property and avoids water oxidation and bacterial growth. C, the outer layer of green PPR is added with ultraviolet absorber, which greatly enhances the anti-aging and impact resistance of the product.

2, the construction should be standardized, hot and cold water pipe spacing should pay attention to?

When living at home, hot and cold water pipes are most prone to problems, such as the interface between water pipes and water heaters, which cannot be docked. The main reason for this situation is that the distance between hot and cold water pipes is not up to standard. It should be noted that the center distance between hot water and cold water embedded in the mixing faucet is 15cm. The error range is 0. 1 cm. ?

3. What should be paid attention to when arranging lights such as water pipes?

Water and electricity pipelines, gas pipelines, etc. They cannot be crossed when they are arranged. If the gas pipe and circuit are pressed under the water pipe, it is easy to leak water or air, causing fire hazards! The layout of hydropower pipelines is horizontal and vertical, so it is not advisable to cross-wire and pull wires nearby! ?

4. The pipeline in the wall must have casing, and PPR is the best material. The planned layout of the power cord needs to meet the maximum output power! ?

5, power socket installation should pay attention to, the number should be enough! If the neutral wire and live wire of the power socket are wrongly connected, it will be short-circuited. Be careful when installing the socket, and conduct a power-on test when receiving water and electricity to confirm whether the power socket can be used normally. The number of power outlets must be reserved enough to ensure future use. In addition, we must pay attention to the following problems in the acceptance of hydropower projects: the kitchen and bathroom must be waterproof, and waterproof tests should be done after completion. When paving tiles after the waterproof project is completed, be sure not to damage the waterproof layer when paving tiles. After the ceramic tile laying is completed, a closed water test should be done. Looking for loopholes. If it is an old house renovation, the owners of the old house renovation should pay special attention. Hydropower project reconstruction is very important, and the layout of hydropower pipelines is unreasonable. We should handle this problem carefully. ?

(Reprinting without permission is prohibited)

The content is provided by Sunshine Vicat, a good user. For more questions, let's live in the APP and communicate directly with the host ~