Which projects must prepare soil and water conservation plans?

According to the Water and Soil Conservation Law and other laws and regulations:

1, collect more than 5 hectares or dig and fill 50,000 m? The above-mentioned construction projects shall prepare water and soil conservation plans;

2. The expropriation area is more than 0.5 hectares and less than 5 hectares, or the total amount of excavation and filling is more than 1000m? Less than 50 thousand m? For earthwork, it is necessary to prepare a report on soil and water conservation plan;

3. The requisition area is less than 0.5 hectares, and the total amount of excavation or fill is less than 1000m? , no longer go through the formalities for examination and approval of soil and water conservation plan.

Production and construction units and individuals shall do a good job in the prevention and control of soil erosion. For projects that have been completed and put into production, it is illegal to go through the formalities for examination and approval of soil and water conservation plans, and it is illegal to "build first and then approve". If the project has been put into operation for more than two years, the water administrative department may no longer require the production and construction unit to go through the formalities for examination and approval of the water and soil conservation plan. If it is not completed within two years, the water administrative department shall, in accordance with the provisions of Article 53 of the Soil and Water Conservation Law, order it to stop the illegal act and go through the formalities for examination and approval of the soil and water conservation plan within a time limit. Those who fail to go through the formalities within the time limit shall be punished by the water administrative department.