Prepare the tool screwdriver.
1. Disassemble the workbench first. There are nine screws on the workbench. Pay attention to which parts have screws. There are screws inside the two edges of the lower part of the workbench, and there are also screws directly above the wheel arch. Two screws.
2. Remove the instrument assembly. Pay attention to the instrument connecting wire during the disassembly process and do not break it.
3. After removing the instrument assembly, the whole picture of the heater is revealed. The heater is connected by three screws. Remove the upper screw first, and then remove the other two screws.
4. Then remove the water pipe connected to the heater water tank. Just take out the heater water tank.