The water diversion project up the mountain was implemented in June 2006, 65438+ 10, and the project has invested more than 400,000 yuan. The water diversion project of Mulan Mountain Ecological Park includes two construction contents, one is to divert water from Tiedong Coal Mine by burying underground water pipelines, and the other is to divert water from Yingjinhe 1 main canal by building open channels. During the implementation of the drainage and water diversion project in Tiedong Coal Mine, the party committee of Fengshuigou Town, the main leaders of the government and the leaders of Xiakanzi Village Committee coordinated with the leaders of Tiedong Coal Mine for many times, and received strong support from Tiedong Coal Mine. The project was successfully implemented as scheduled. The project has been successfully completed, with a total investment of 654.38+10,000 yuan and buried pipelines 1 100 meters. The project not only effectively utilized mine drainage, but also solved the water demand of Mulan Mountain Ecological Park.
In the first half of 2006, the town began to implement the Yingjinhe 1 main canal diversion project, and invested more than 300,000 yuan to build a 2000-meter soil canal. In order to ensure the safety of the canal, they built an anti-seepage canal with cement slurry in the canal section with large slope, which effectively prevented the leakage of canal water. From June 5, 2006 to 2006 10, the project is drawing to a close and can be put into use in the winter of 2006.
It is understood that after the two water diversion projects are put into use, more than 6,543,800 cubic meters of water can be delivered to the small reservoir of Mulan Mountain Economic Valley every year. After the second phase of water lifting is introduced into the ecological park, 6.5438+0.5 million mu of dry land in the park will all become irrigated land, laying a solid foundation for the sustainable and benign development of Mulan Mountain Ecological Park.