Decoration skills of new Chinese living room residence

1. When designing hydropower lines, it is necessary to determine the positions of switch sockets, faucets, water outlets and wiring modes, so as to prevent sockets and switches from being placed behind furniture, electrical appliances and doors.

2. Negotiate with the decoration company to clarify the decoration concept and determine the decoration project.

3. Sign renovation contract.

4. Test whether the waterproofing of kitchen and bathroom is effective. If it is invalid, the developer must be repaired and improved again, and the waterproofing should be re-tested.

5. The cabinet puts forward the position and suggestion of changing water in kitchen and bathroom.

6. Electrical switches and sockets.

7, in the hydropower transformation and main demolition, cabinet should be measured for the first time.

Do a good job in the position of the upper air outlet and socket of the range hood.

8. After the hydropower transformation, the water pipes shall be pressure tested, and the wall shall be sealed with cement where the water is changed.

9, toilet brush waterproof coating and mortar, waterproof test again, to be qualified, otherwise you must redo the waterproof.

10. Determine the position of the ceramic tile on the kitchen and bathroom wall and start tiling.

1 1, door, door cover, window cover, please ask relevant personnel to measure at home.

12, range hood, water heater, cooker, determine the size of range hood and cooker.

13. After tiling the wall, please ask the cabinet manufacturer to check the position of the wall and the ground again, negotiate the price, and finally determine the style and position of the cabinet.