1. Project location: North side of Huanlong Trade City, Dongditou Village, Xiditou Town, Beichen District.
2. Project transportation: The overall location is relatively far from the urban area and close to the Beijing-Tianjin Expressway, making it easy to drive into the urban area. There are bus lines such as 566 and 726-727 in the surrounding area, which are also convenient to take.
Developer: Tianjin Oriental Binhai Automobile City Co., Ltd. In recent years, we have insisted on deepening reforms, changing the single economy, implementing multiple industries simultaneously, and gradually embarking on the path of healthy development. The experience in development projects is not very sufficient, and this project is a representative project.
4. Project composition: Maple Water Bay Phase II has 9 buildings, including 6 high-rise buildings and 3 elevator houses. The high-rise buildings have floors 11-17 to the top, and the bungalows have floors 6 to the top. The total number of households is 382.
5. Overall introduction: It is outside the outer ring and is relatively far from the city, but it is close to the Beijing-Tianjin Expressway, making it easy to drive to the city. The second phase of the project is not very large as a whole, with low residential density and a relatively good community environment. It is close to Yongding New River and the natural environment is relatively good. The owners’ children can easily attend Dong Didou Primary School, which can also meet the schooling needs of the owners’ children. It is a market that is in urgent need of improvement in the local area, with a low price and high cost performance. However, the house design tends to be pistol-shaped, which wastes a lot of area. There are no large-scale community facilities in the surrounding area, but it is convenient to drive to the Xiditou Town Government Commercial Street for shopping.