2. Bonding rockery: Bonding mountain,
The first step is to adjust the cement mortar, pay attention to the mortar to be used with it, and also pay attention to the thin consistency of the mortar.
The second step is stone processing, which uses tools such as hammer, chisel and saw to process the mountain that needs to be glued to make textures and grotesque shapes.
Step 3, bond the mountain, and coat cement mortar on both sides of the rock to be bonded with the panel, so that the rock can be bonded into a whole. Attention should be paid to bonding, and no trace of fracture should be seen at the bonding place of rock as far as possible.
Also pay attention to clean up the excess mucilage at the bonding point.
3. Maintenance of rockery: After the mountain is built, you can't touch it immediately. Sprinkle water for two or three days, and the mountain will be basically stable.
4, 4 days later, put in a fish tank.