The road occupation construction period is from June 2022 10 to June 2023 10.
1. Chuanshan Avenue to the intersection of Hongxiang North Road and Chuanshan Avenue on the south side of Xihe Road is about 300 meters, occupying the first, second and third lanes on the south side for 9 meters, without occupying the sidewalk.
2. It is about 270 meters from the intersection of Hongxiang North Road on the south side of Chuanshan Avenue to Taiping Community (West Gate), occupying 9 meters of the first, second and third lanes on the south side, and not occupying the sidewalk.
3. It is about 200 meters from the mouth of Cai Lun Avenue on the south side of Chuanshan Avenue to zhengxiang district Maternal and Child Health Hospital in Hengyang City, occupying 9 meters of the first, second and third lanes on the south side and not occupying the sidewalk.