Where does the Chongqing train pass through the building?

The passing station is Liziba Light Rail Station, and the train platform is located on the 8th floor.

Chongqing Light Rail, which is popular all over the world, is Line 2, and the station this light rail passes through is Liziba Light Rail Station. The train platform is located on the 8th floor, 1~5 floors are shops, 9 ~ 19 property market is residential, and there is a 6 ~ 8 floor train platform in the middle, with a length of 132m.

Liziba Station is a stop of Chongqing Light Rail Line 2, and there are many delicious places around the light rail station. Liziba Liangshan Chicken near Liziba Anti-Japanese War Ruins Park is the network celebrity cuisine in this area. The lower part of the building is the office area and the station, and the upper part is the residential area. Railway tracks are built between the buildings, leaving a height for trains to pass, so the running trains pass along the tracks.

Extended data:

Liziba Station of Line 2 was put into trial operation in 2004 and officially put into operation in 2006. As early as 1998, the team started a "crossing" design without precedent in China-let Line 2 pass through the building.

The building standards of buildings and rail transit are different, and the approval procedures are also different. At that time, the design team faced three major problems that must be solved. One is to ensure that the track can pass through the building smoothly; Secondly, when the track passes through the building, it cannot affect the building structure; Finally, the functional layout of rail station traffic conversion should be reasonable, which can guide passenger flow and meet the travel of surrounding residents.

People's Network-Chongqing Light Rail passes through apartment buildings. These trains are amazing.