What procedures are required for fire control acceptance of construction projects?

1. Fill in the Declaration Form for Fire Control Acceptance of Building Engineering; 2. Provide a copy of the fire protection design audit opinion (original); 3. Project completion acceptance report; 4. Provide legal certification documents of the construction unit and supervision unit, including: business license, copy of qualification (copy stamped with red seal); 5. Fire protection product registration form; 6. Fire protection product quality certificate and fire protection product identification information (scanning label); 7. Certificate of approval, ex-factory certificate, test report, etc. Building components, building materials and interior decoration materials that meet the requirements of fire protection performance meet the national standards or industry standards; 8 fire facilities, electrical fire prevention technology inspection certificate (qualified inspection unit); 9. Test report on external thermal insulation materials of civil buildings; 10. as-built drawing (the construction unit shall affix the seal of completion); 1 1. Other materials required by law.