2065438+became a real house slave on March 25th, 2004.
I thought about buying a house in Dongguan, but I didn't expect it to be so soon. Originally, I went to the lottery with the mentality of trying, and I won more than 700. By the time we choose a house, there is not much room to choose, either 124 large apartment or 04 tail number. I like big apartments very much, but I am short of money, so I let you go.
When I went in to choose the number, I found that there was a 505 that had not been sold. Do we still need to hesitate? That's it. It can not only save 10 thousand yuan to avoid acrophobia, but also exercise in time because of occasional power failure. Why not? As a result, we resolutely paid a 5W deposit, and then went back to call our classmates and friends to borrow tens of thousands of silver, and went through a series of complicated house purchase procedures within a time limit, becoming real house slaves!
Dream and Life
At 13, 12, the neighbors in the group said they could go in and see the house. Looking forward to it for too long, I finally want to see the true colors of the nest, and I feel a little uneasy.
My husband and I went to the weekend, and the room number was not marked outside. As soon as I entered the room, I doubted whether I was wrong. The balcony is so small, the living room is so dark, the bathroom is basically black, and the door is facing the power distribution room. On the one hand, the water supply control room is more and more entangled, and I regret it. This is the painful lesson of buying without looking at the house. You really can't find these troubles just by looking at the floor plan. Mr. Wang listened to my rambling and said categorically that this is the room, and that's it from there. Later, he took me to see the rooms 04 and 06 next door, and once again certified that the correct room is a dream may come. Wake up!
2065438+House List on March 25th, 2004
I haven't found the sketch, master bedroom, guest bedroom, corridor, kitchen and living room yet. I'll make it up next time.
2065438+2004-03-26, the decoration should be done early.
Because the house is delivered at the end of the year, the decoration time will generally be set after the year. In order to sprint at the end of the year, decoration companies and building materials businesses will launch some "preferential" activities to attract customers. On the other hand, the decoration labor is skyrocketing every year, and the decoration quotation after the year is bound to be greatly adjusted. Therefore, Mo Mo's family began to look for a decoration company before confiscating the building.
In June last year, HX held an event in Yuelai Hotel, and was confused by the "deposit of 30,000" on the leaflet. Under the offensive of patient explanation and advice from the other party, it brushed 6,000 silver (3,000 decoration deposit+3,000 building materials deposit) on a whim, and was considered as a pre-decoration company.
2065438+kitchen renovation plan on March 26th, 2004
Irregular kitchen, this part of the change will be relatively large, the wall will be removed, and life balcony will be included in the kitchen to increase the sense of transparency and space in the kitchen.
20 14 March 29th is a memorable day.
An unforgettable day. The day before, I made an appointment with the decoration company and South China University of Technology. The next day, I took the information and went straight to Dongcheng to sign renovation contract.
Being 20 minutes late made China workers wait for a long time. When I arrived at the office of the decoration company, I checked the quotation and construction drawing according to the procedure and found that several small items in the quotation were not updated, which led to the inconsistency of the total price. At our strong request, I added the estimated price of water and electricity to the quotation (this was learned from reading the decoration diary in the forum, and adding the estimated price of water and electricity to the quotation can pave the way for the subsequent supplementary contract agreement).
2065438+Signing Collection on March 29th, 2004
Referring to the total quotation, there is an episode in the middle. Last week, I negotiated the total price with the designer. It's time to sign the contract and seal it. The discount amount given by the designer is several thousand dollars worse than last week. I am shocked! So I mentioned the quotation I talked with the designer last week, and He Gong said he was wrong and speechless!
I can't help it. I didn't ask him for a specific discount at that time. Now it's time to sign the contract. After agreeing with the decoration company to drop a few percentage points, I successfully signed the renovation contract, and finally took a big step towards the decoration journey.
Car owner experience:
Before signing the contract, you must carefully check the quotation and check it item by item to find out what to do, what materials to use (who bought the materials) and what the construction technology is. Compare the quotations of several local decoration companies from the price. The important thing is to talk about the total price first, then talk about sir, ask more questions and be sure, and when it comes to discounts, determine what the discount is.