Why didn't you hand over the second phase of Wangchengling Apartment?
The reason why the second phase of Chengling apartment was not handed over was that it was not time to hand over the house. According to relevant public information, the announcement of the second phase of Wangchengling Apartment shows that the house will be delivered at the end of 2024. The project started construction on May 30, 2009+2065438, and is located in Lishui Liandu, east to the Ring Road, north to Chengbei Street and south to Liyang Street. Underground 1 floor, aboveground 17- 18 floor. * * * There are 25 houses with a total construction area of 238,970.438+0 square meters, aboveground construction area of168,235.87 square meters, underground construction area of 70,734.44 square meters and civil air defense area of 65,434. * * * There are 0/602 sets of residential buildings and 0/673 parking spaces for motor vehicles, including 0/32 above-ground parking spaces and 0/54 underground parking spaces. Building density 13.7%, green space rate 45.67%. The total project cost is 849,847,239 yuan.