Fire information approval:
A, the construction project fire protection design audit declaration form in duplicate, the cover of the audit form and the name of the project on the first page of the form are stamped with the official seal of the construction unit.
Two, the construction unit's business license and other legal identity documents, stamped with the official seal of the construction unit; (Copy of business license with official seal)
Three, the construction project planning permit documents for new construction and expansion projects;
Four, the design unit qualification documents, stamped with the official seal of the design unit; (Copy of business license with official seal)
Five, the power of attorney of the construction unit (with the official seal of the construction unit) and a copy of the client's ID card.
Six, fire design documents:
1, design specification (printed in A4 white paper, each page stamped with the special seal for examination and approval by the design unit)
2. Cover: project name, design unit and design date.
3. Title page: the names of the legal representative, technical director, project director, electrical professional director and fire professional director of the design unit, which shall be signed or sealed by the above-mentioned personnel.
4. Directory of design documents
5, design description:
(1) The basis of engineering design includes the main laws and regulations implemented in the design and the main standards adopted (including the name, serial number, year and version number of the standards), as well as the information provided by the construction unit about the use requirements or production technology.
② Construction scale and design scope.
(3) Main fire-fighting equipment, fire-fighting products, building components and building materials with fire-fighting performance requirements that have been set (or added) in the project.
(4) Adopting new technologies, new materials, new equipment and new structures.
⑤ Fire protection design with special fire risk and problems that need to be solved or determined when design approval is needed.
Seven, design drawings:
Requirements1; 100 or1; 150 blueprints are stacked in A4 standard stacking mode for archiving. The drawings shall be stamped with the special seal for the annual drawings submitted by the design unit for examination and approval.
1, indicating the location of planning red line, fire water source, fire lane and outdoor fire water supply pipeline.
Layout (extracted separately)
2, a full set of drawings (architecture, water supply and drainage, electrical professional and strong electricity, weak electricity, HVAC and
Air conditioning professional construction drawing and fire related process layout).
3. Layout of automatic fire fighting facilities; (Automatic fire fighting facilities refer to: fire water supply and automatic fire extinguishing system; Fire protection design of smoke prevention, exhaust, ventilation and air conditioning system; Fire power supply and distribution; Fire emergency lighting, emergency broadcasting and evacuation signs; Automatic fire alarm system and fire control room)