How to apply for fire control approval for secondary decoration in Shenzhen?

First of all, the decoration of your unit in the document of the Ministry of Public Security 106 belongs to the small interior decoration project and belongs to the filing project. Don't declare online, it's too slow. Some things need to be explained to you personally by the window staff. Run by yourself. No one usually watches it online.

Secondly, according to the relevant laws and regulations, you should go to the fire service window of the local government administrative service center to declare the fire interior decoration for the record. If the declared parts are complete, draw lots on the computer in the service hall. If you win the lottery, the service hall will submit your unit's interior decoration engineering drawings to the brigade for review (20 working days). After the approval, you will be informed by phone to go to the service hall for acceptance and lottery again (it depends on whether you construct according to the drawings, and if you draw lots, you need to fill out several forms, and then the service hall will report your materials to the local fire brigade, which will organize personnel to your unit for acceptance within 20 working days, and you can put them into use after acceptance; If you don't draw, you can put it into use directly.

However, in the actual operation process, small decoration projects under 200 square meters, such as your unit, are generally not declared if there is no fire record, but I think it is best to declare. If there is a fire in the future, the liability of the legal person will be small.

Specifically, go to the fire service window of the local government administrative service center for consultation, and he will give you a contact list indicating what procedures are needed. I remember filling out an application form with two key points: the legality of your building (ask the building property or the owner for the fire inspection opinions of the building where you are decorating) and the qualification of the design unit (Grade B or above). The problem is not big. Transformation can be carried out at the same time as the project filing and declaration. You don't have to wait until the audit opinion comes down, but large projects need to be approved before construction. If you are in a hurry to decorate, please report it quickly (please refer to the above regulations in the Ministry of Public Security 106). In addition, beware of scalpers. Some people say that they are familiar with fire fighting, and it is easy for them to help you with the formalities. Making some money among them will also tarnish the image of the public security fire brigade. No one can do it without components. The scalper will definitely come back, so it's easy for you to prepare yourself and do it yourself.