Bidding procedures are divided into general procedures, simple procedures and special procedures according to the nature of the project.
The general procedure refers to the bidding procedure of directly determining the winning bidder after bid opening (applicable to the lowest price method) or determining the winning bidder through bid evaluation without pre-qualification. The bidding period generally takes 15 ~ 25 days.
Summary procedure refers to the bidding procedure of determining the winning bidder by drawing lots without pre-qualification. The summary procedure is applicable to the bidding of projects other than simple projects that can be selected by lottery. The bidding period generally takes 5 ~ 10 days.
Special procedures refer to the bidding procedures for pre-qualification and determination of the winning bidder through bid evaluation. Special procedures are applicable to the project bidding that can be prequalified after approval. The bidding period generally takes 25 ~ 35 days.
Which procedure is applicable is related to your project investment, you can consult the local construction administrative department, and the filing process is generally done as soon as it arrives.